BT SC-20, SC-30 Counterbalanced Electric Stacker Truck Operating – Maintenance – Parts Manual 310564-000

$30.00

  • Type Of Manual: Operating – Maintenance – Parts Manual
  • Manual ID: 310564-000
  • : Parts Manual PDF
  • Number of Pages: 40
  • Size: 2.2MB
  • Format: PDF

Product details

  • Model List:

    • SC-20, SC-30 Counterbalanced Electric Stacker Truck
  • 1. Front Cover
  • 2. Prime-Mover Warranty
  • 3. To New Prime-Mover Owners
  • 4. Contents
  • 5. Operating Instructions
  • 5.1. Preliminary Service
  • 5.2. Controls
  • 5.2.1. Safety Interlock
  • 5.2.2. Mast Controls
  • 5.2.3. Direction Control
  • 5.2.4. Deadman Brake
  • 5.2.5. Time Delay
  • 5.2.6. Key Switch (optional)
  • 5.2.7. Dynamic Brake (optional)
  • 5.2.8. Field Weakening (optional over-speed)
  • 6. Operator Inspection and Maintenance Procedures
  • 6.1. Semi-Annually (or as required)
  • 6.2. Battery Care
  • 7. Maintenance Instructions
  • 7.1. Battery
  • 7.2. Power Wiring
  • 7.3. Control Wiring
  • 7.4. Control Switches (handle)
  • 7.5. Mechanical Brake
  • 7.6. Interlock Switch
  • 7.7. Transmission Rollers
  • 7.8. Contactor Points
  • 7.9. Motor Commutator
  • 7.10. Hydraulic System
  • 8. Service and Disassembly Instructions
  • 8.1. Direction Control Switches
  • 8.2. Transmission
  • 8.3. Drive Motor
  • 8.4. Drive Gear Adjustment
  • 8.5. Electric Control Panel
  • 8.6. Hydraulic Pump
  • 8.7. Mast Assembly
  • 8.8. Lift Frame
  • 8.9. Inner Column
  • 8.10. Tilt Cylinder
  • 8.11. Hydraulic Lift Cylinder
  • 8.12. Gear Case Guide Ring
  • 9. Parts Ordering Instructions
  • 9.1. How to Order
  • 9.2. Where to Order
  • 9.3. Instructions for Returning Parts
  • 10. Parts List Index
  • 10.1. Frame Fittings
  • 10.2. Control Handle
  • 10.3. Transmission Assembly 12V
  • 10.4. Drive Motor Service Parts
  • 10.5. Transmission Assembly 24 V
  • 10.6. Drive Motor Service Parts
  • 10.7. Electrical Control Panel
  • 10.8. Power Wiring
  • 10.9. Control Wiring
  • 10.10. Hydraulic Piping Diagram 12 V
  • 10.11. Hydraulic Piping Diagram 24 V
  • 10.12. Tilt Cylinder
  • 10.13. Hydraulic Unit Assembly 12 V
  • 10.14. Hydraulic Pump and Motor 24 V
  • 10.15. Lift – Tilt Linkage
  • 10.16. Control Valve
  • 10.17. Hydraulic Cylinder Assembly
  • 10.18. Hydraulic Cylinder Assembly
  • 10.19. Sheave Head
  • 11. Service Guide
  • 12. Back Cover
Rate this product