Caterpillar MD6290 Rotary Blasthole Drill Parts Manual BI006996
$30.00
- Type Of Manual: Parts Manual
- Manual ID: BI006996
- Number of Pages: 591
- Size: 21.8MB
- Format: PDF
Category: Caterpillar Parts Manual PDF
-
Model List:
- MD6290 Rotary Blasthole Drill
- 1.
- 2. PARTS MANUAL MD6290 S N 2U68A
- 3. GENERAL ASSEMBLY ITEMS LIST
- 4. SECTION 1 GENERAL LOCATOR D.pdf
- 4.1. SECTION 1 GENERAL LOCATOR D
- 4.2. FILTER ELEMENTS
- 4.3. DECAL KIT CAT YELLOW MD6290
- 4.4. DECAL KIT WARNING
- 5. SECTION 2 OPERATOR S CAB.pdf
- 5.1. SECTION 2 OPERATOR S CAB
- 5.2. CAB ASSEMBLY W GAUGES AND ATTAC
- 5.3. JUMPER SEAT WITH ATTACHING HARD
- 5.4. PANEL GAUGES ENGINE
- 5.5. PANEL GAUGES HYDRAULIC
- 5.6. PANEL SWITCHES DRILL FUNCTIO
- 5.7. CONTROL MAST JACKS
- 5.8. INSULATION KIT CAB SPECIAL
- 5.9. CAB HOSE PLUMBING
- 5.10. CAB MODIFICATION ELECTRIC HAND
- 5.11. ROTARY OPERATOR S SEAT
- 5.12. SEAT BELT W TETHER AND HARDWARE
- 5.13. SEAT AIR ACCUMULATOR INSTALLATI
- 5.14. AIR CONDITIONER HEATER PRESSURI
- 5.15. HEATER AIR CONDITIONER PACKAG
- 5.16. AIR CLEANER ASSEMBLY A C HEATE
- 5.17. CONDENSER 24V
- 5.18. WALL MOUNT UNIT W ANGLE LOUVERS
- 5.19. BLOWER ASSEMBLY A C HEATER PRE
- 5.20. HOSE KIT AIR CONDITIONER
- 5.21. GLASS INSTALLATION CAB TINTED
- 5.22. WIPER WASHER INSTALLATION LE
- 5.23. WIPER WASHER ASSEMBLY OPERAT
- 5.24. WIPER WASHER INSTALLATION RE
- 5.25. WIPER WASHER INSTALLATION RI
- 6. SECTION 3 MAINFRAME CRAWLER.pdf
- 6.1. SECTION 3 MAINFRAME CRAWLER
- 6.2. MAINFRAME CRAWLER ASSEMBLY
- 6.3. UNDERCARRIAGE ASSEMBLY
- 6.4. ROCK GUARD COMPLETE FRONT AND
- 6.5. TRACK ASSEMBLY W SHOES 53 LINK
- 6.6. IDLER ASSEMBLY W SLIDE BAR
- 6.7. SPRING ASSEMBLY COMPLETE
- 6.8. ROCK GUARD COMPLETE MIDDLE
- 6.9. HYDRAULIC TENSIONER IDLER ASSE
- 6.10. PROPEL PLUMBING
- 6.11. FLOOR COVERING DUST SEALS
- 6.12. CYLINDER MAST ELEVATING
- 6.13. MANIFOLD INSTALLATION SUCTION
- 6.14. COUNTERBALANCE VALVE ASSEMBLY
- 6.15. WALKWAY INSTALLATION CAB
- 6.16. VALVE ASSEMBLY W ATTACHMENTS D
- 6.17. VALVE ASSEMBLY LESS ATTACHMENTS
- 6.18. VALVE ASSEMBLY W ATTACHMENTS F
- 6.19. VALVE ASSEMBLY LESS ATTACHMENTSZ
- 6.20. MANIFOLD W ATTACHMENTS RETURN
- 6.21. MANIFOLD W ATTACHMENTS CASE DR
- 6.22. MANIFOLD W ATTACHMENTS
- 6.23. VALVE ASSEMBLY W ATTACHMENTS R
- 6.24. VALVE W ATTACHMENTS SHUTTLE
- 6.25. VALVE ASSEMBLY JACKS MAST CONT
- 6.26. VALVE ASSEMBLY JACKS MAST CONTZ
- 6.27. VALVE ASSEMBLY W ATTACHMENTS V
- 6.28. VALVE ASSEMBLY LESS ATTACHMENTSX
- 6.29. VALVE ASSEMBLY DUST COLLECTOR
- 6.30. VALVE ASSEMBLY DUST COLLECTORX
- 6.31. VALVE ASSEMBLY DIVERTER W ATTA
- 6.32. VALVE ASSEMBLY W ATTACHMENTS RX
- 6.33. FUEL TANK INSTALLATION W PLUMBI
- 6.34. FUEL TANK SUBASSEMBLY
- 6.35. JACK INSTALLATION 48
- 6.36. CYLINDER ASSEMBLY JACK
- 6.37. TRACK 2 SPEED PROPEL INSTALLATI
- 6.38. VIEWING HATCH DRILL DECK
- 6.39. HYDRAULIC CYLINDER
- 6.40. VIEWING HATCH PLUMBING
- 7. SECTION 4 ENGINES COMPRESSO.pdf
- 7.1. SECTION 4 ENGINES COMPRESSO
- 7.2. ENGINE WITH ATTACHMENTS CAT C1
- 7.3. COUPLING PUMP DRIVE GEARBOX TO
- 7.4. MUFFLER INSTALLATION TWIN ENG
- 7.5. FUEL FILTER ASSEMBLY
- 7.6. FUEL FILTER
- 7.7. ENGINE PANEL STARTUP ASSEMBLY
- 7.8. ENGINE PRELUBE INSTALLATION C
- 7.9. ENGINE PRELUBE PUMP
- 7.10. ENGINE EXHAUST BLANKET INSTALLA
- 7.11. AIR CLEANER INSTALLATION ENGIN
- 7.12. AIR CLEANER ASSEMBLY
- 7.13. GUARD INSTALLATION DRIVELINE
- 7.14. ENGINE CHARGE AIR PIPING
- 7.15. WATER COOLANT PIPING ASSEMBLY
- 7.16. AIR COMPRESSOR WITH ATTACHMENTS
- 7.17. AIR COMPRESSOR PACKAGE SERVICE
- 7.18. AIR INLET VALVE 8 INCH INLET
- 7.19. TORSIONAL DRIVE COUPLING
- 7.20. AIR CLEANER INSTALLATION COMPR
- 7.21. COMPRESSOR AIR RECEIVER PIPIN
- 7.22. COMPRESSOR AIR RECEIVER HOSE
- 7.23. AIR COMPRESSOR HOSE ASSEMBLY
- 7.24. HYDRAULIC FILTER ASSEMBLY COMP
- 7.25. COOLER ASSEMBLY W PLUMBING ENG
- 7.26. COOLER ASSEMBLY
- 7.27. CHARGE AIR AFTERCOOLER ASSEMB
- 7.28. MOTOR FAN
- 7.29. THERMOSTATIC VALVE ASSEMBLY
- 7.30. PUMP DRIVE ASSEMBLY
- 7.31. PUMP DRIVE GEARBOX ASSEMBLY 3
- 7.32. MAIN PUMP CLOSED LOOP
- 7.33. SHAFT SEAL AND CASE DRAIN PLUG
- 7.34. PORT PLATE HOUSING AND VALVES S
- 7.35. PTO ADD ON SPARE PARTS LIST
- 7.36. FILTER ELIMINATION FLANGE SPARE
- 7.37. E1P CONTROL ASSEMBLY SPARE PART
- 7.38. MAIN PUMP OPEN LOOP
- 7.39. SHAFT SEAL AND CASE DRAIN SPARE
- 7.40. HIGH PRESSURE END FLANGE PLUG A
- 7.41. LP CONTROL ASSEMBLY LIST
- 7.42. CHARGE PUMP
- 7.43. GEAR PUMP FAN DUST COLLECTOR
- 7.44. HYDRAULIC FILTER ASSEMBLY CHAR
- 7.45. BLOWDOWN AIR HOSE ASSEMBLY
- 8. SECTION 5 DUST CONTROL.pdf
- 8.1. SECTION 5 DUST CONTROL
- 8.2. COVER PLATE INSTALLATION NO DU
- 8.3. DUST CURTAIN INSTALLATION
- 8.4. DUST CURTAIN RAISE LOWER ASSEMB
- 8.5. HYDRAULIC CYLINDER ASSEMBLY
- 8.6. DUST CURTAIN PLUMBING COLD WE
- 8.7. WATER INJECTION SYSTEM HORIZO
- 8.8. VALVE FLOW CONTROL
- 8.9. WATER INJECTION PLUMBING
- 8.10. WATER PUMP MOUNT ASSEMBLY
- 8.11. WATER PUMP ASSEMBLY HORIZONTA
- 8.12. HYDRAULIC MOTOR
- 9. SECTION 6 MAST.pdf
- 9.1. SECTION 6 MAST
- 9.2. MAST ASSEMBLY 11 5M
- 9.3. MAST PIVOT WELDMENT OUTSIDE
- 9.4. CYLINDER HOIST AND PULLDOWN M
- 9.5. GUIDE ASSEMBLY SHEAVE MAST
- 9.6. SHEAVE 22 INCH OD W BEARING
- 9.7. VALVE ASSEMBLY MAST 9 SECTI
- 9.8. VALVE ASSEMBLY MAST 9 SECTIO
- 9.9. DUST HOOD INSTALLATION
- 9.10. MAST PLUMBING 11 5 METER MAST
- 9.11. PIPE RACK INSTALLATION
- 9.12. MOTOR HYDRAULIC
- 9.13. HYDRAULIC CYLINDER ASSEMBLY S
- 9.14. ROTARY DRIVE ASSEMBLY
- 9.15. ROTARY DRIVE GEARBOX ASSEMBLY
- 9.16. ROTARY DRIVE MOTOR HOSE KIT
- 9.17. ROTARY DRIVE MOTOR FIELD KIT
- 9.18. HYDRAULIC OPERATED BREAKOUT WRE
- 9.19. HYDRAULIC CYLINDER ASSEMBLY C
- 9.20. HYDRAULIC CYLINDER ASSEMBLY R
- 9.21. HYDRAULIC OPERATED BREAKOUT WREZ
- 9.22. AUTOMATIC TOOL WRENCH
- 9.23. PIPE RACK ROTATE PLUMBING
- 9.24. AUTO TOOL WRENCH PLUMBING
- 9.25. PIPE RACK CAROUSEL LOCK PLUMBIN
- 9.26. PIPE RACK SWING PLUMBING
- 9.27. MAST LOCK INSTALLATION
- 9.28. WINCH INSTALLATION BG8
- 9.29. WINCH CASE DRAIN CONVERSION KIT
- 9.30. WINCH ASSEMBLY
- 9.31. BRAKE VALVE ASSEMBLY WINCH
- 9.32. WINCH PLUMBING HOSE KIT
- 10. SECTION 7 DRILLING TOOLS AC.pdf
- 10.1. SECTION 7 DRILLING TOOLS AC
- 10.2. PIPE POSITIONER INSTALLATION
- 10.3. PIPE POSITIONER PLUMBING COLD
- 10.4. PIPE POSITIONER SENSOR COMPONEN
- 10.5. PIPE RACK INTERLOCK
- 10.6. TACHOMETER INSTALLATION ROTARY
- 10.7. CABLE COVER KIT TACK DRIVE
- 10.8. MAST AUTO LUBE INJECTORS
- 10.9. MAST AUTO LUBE HOSE KIT
- 10.10. GUIDE BUSHING 4 1 2 INCH O D
- 10.11. DRILL STEM 4 1 2 INCH O D X 3
- 10.12. MAINFRAME AUTO LUBE INJECTORS
- 10.13. MAINFRAME AUTO LUBE INJECTORS H
- 10.14. MANUAL LUBE PUMP INSTALLATION
- 10.15. TRAM INTERLOCK JACK
- 10.16. TRAM INTERLOCK DRILL STEM
- 10.17. LUBRICATOR INSTALLATION DRILL
- 10.18. VALVE AIR
- 10.19. VALVE AIR part of 330617
- 10.20. VALVE AIR SOLENOID W JUNCTION
- 10.21. LUBRICATOR ASSEMBLY DRILL STEM
- 10.22. FILTER REGULATOR LUBRICATOR
- 10.23. LUBRICATOR HOSE PLUMBING KIT D
- 10.24. RAPID FILL INSTALLATION FUEL
- 11. SECTION 8 HYDRAULICS PLUMBI.pdf
- 11.1. SECTION 8 HYDRAULICS PLUMBI
- 11.2. MAST LOCK PLUMBING
- 11.3. AUXILIARY PUMP AND FEED VALVE P
- 11.4. VALVE PLUMBING JACKS MAST
- 11.5. MAST ELEVATING PLUMBING
- 11.6. CHARGE HOSE PLUMBING
- 11.7. SUCTION RETURN DRAIN PLUMBI
- 11.8. HYDRAULIC FEED SYSTEM MODIFICAT
- 11.9. HYDRAULIC FEED SYSTEM MODIFICATZ
- 11.10. HYDRAULIC RESERVOIR INSTALLATIO
- 11.11. HYDRAULIC RESERVOIR SUBASSEMBLY
- 11.12. FILTER ASSEMBLY MAIN RETURN
- 11.13. FILTER ASSEMBLY CASE RETURN
- 11.14. HYDRAULIC HAND PUMP ASSEMBLY
- 11.15. TEST STATION MACHINE SYSTEM HY
- 11.16. HOSE KIT HYDRAULIC TEST SYSTE
- 11.17. FILTER INDICATOR WIRING
- 11.18. JACK PLUMBING
- 11.19. CLOSED LOOP PLUMBING W LOOP FIL
- 11.20. FILTER ASSEMBLY LOOP
- 11.21. LOOP FILTER PLUMBING
- 11.22. HYDRAULIC VALVE PROXIMITY SWITC
- 12. SECTION 9 ELECTRICAL.pdf
- 12.1. SECTION 9 ELECTRICAL
- 12.2. ELECTRICAL SCHEMATIC
- 12.3. CAB WIRING
- 12.4. CAB ENGINE WIRING
- 12.5. CAB AIR AND CURTAIN VALVE WIR
- 12.6. CAB MAST VALVE WIRING
- 12.7. PUMP WIRING
- 12.8. PULLDOWN VALVE WIRING
- 12.9. STANDARD LIGHT PACKAGE WIRING
- 12.10. ENGINE HOUR METER WIRING
- 12.11. AUXILIARY PRESSURE PUMP WIRING
- 12.12. WATER AND DUST COLLECTOR VALVE
- 12.13. FAST PULLDOWN WIRING
- 12.14. CAB TOP LIGHTS WIRING
- 12.15. ADDITIONAL BATTERY INSTALLATION
- 12.16. BATTERY BOX ASSEMBLY
- 12.17. BATTERY ENGINE DISCONNECT INS
- 12.18. ELECTRICAL SCHEMATIC LADDER LO
- 12.19. ADDITIONAL LIGHTING KIT
Rate this product
You may also like















