Bucyrus 495B Electric Mining Shovel Mechanical Maintenance Manual BI616751
$30.00
- Type Of Manual: Mechanical Maintenance Manual
- Manual ID: BI616751
- Number of Pages: 238
- Size: 12.7MB
- Format: PDF
Product details
-
Model List:
- 495B Electric Mining Shovel
- 1. COVER PAGE
- 2. TABLE OF CONTENTS
- 3. FOREWORD
- 4. MECHANICAL MAINTENANCE
- 4.1. MAINTENANCE PROCEDURE
- 4.1.1. GENERAL
- 4.1.2. MAINTENANCE SCHEDULES AND REPORTS
- 4.1.2.1. GENERAL
- 4.1.2.2. IN-OPERATION MAINTENANCE
- 4.1.2.3. PRECAUTIONS BEFORE AND DURING MAINTENANCE WORK
- 4.2. LOWER WORKS
- 4.2.1. CRAWLER BELTS
- 4.2.2. TAKE-UP TUMBLER
- 4.2.3. UPPER ROLLERS
- 4.2.4. LOWER ROLLERS
- 4.2.5. DRIVE TUMBLER
- 4.2.6. TUMBLER DRIVE SHAFT GEAR
- 4.2.7. TRANSVERSE SHAFT
- 4.2.8. PROPEL CLUTCHES
- 4.2.9. PROPEL BRAKES
- 4.2.10. PROPEL MOTOR
- 4.2.11. PROPEL TACH ASSEMBLY
- 4.2.12. PROPEL MACHINERY
- 4.2.13. CRAWLER FRAMES AND TRUCK FRAMES
- 4.2.14. SWING RACK
- 4.2.15. ROLLER CIRCLE
- 4.2.16. CENTER PINTLE
- 4.2.17. COLLECTOR RINGS
- 4.2.18. CABLE REEL
- 4.3. ROTATING DECK
- 4.3.1. REVOLVING FRAME
- 4.3.2. DECK MACHINERY
- 4.3.3. HOIST MACHINERY
- 4.3.3.1. GEAR TRAIN
- 4.3.3.2. HOIST GEAR AND DRUM
- 4.3.3.3. HOIST BRAKES
- 4.3.3.4. HOIST LIMIT SWITCH
- 4.3.3.5. HOIST MOTOR
- 4.3.4. CROWD MACHINERY
- 4.3.4.1. GEAR TRAIN
- 4.3.4.2. CROWD MOTOR
- 4.3.4.3. CROWD BRAKE
- 4.3.4.4. CROWD GEAR AND DRUM
- 4.3.4.5. CROWD AND RETRACT LIMIT SWITCH
- 4.3.5. SWING MACHINERY
- 4.3.5.1. GEAR TRAIN
- 4.3.5.2. SWING MOTOR
- 4.3.5.3. SWING BRAKE
- 4.3.6. MACHINERY HOUSE
- 4.3.7. HOUSE FANS
- 4.3.8. DYNAVANE AIR CLEANER
- 4.3.9. WALKWAYS
- 4.3.10. OPERATORS CAB
- 4.3.10.1. WINDSHIELD WIPERS
- 4.3.10.2. WINDSHIELD WASHER
- 4.3.10.3. RETRACTABLE BOARDING LADDER
- 4.4. FRONT END EQUIPTMENT
- 4.4.1. BOON POINT SHEAVES
- 4.4.2. BOOM BUMPERS
- 4.4.3. SADDLE BLOCK
- 4.4.4. DIPPER HANDLE
- 4.4.4.1. DIPPER HANDLE REMOVAL
- 4.4.5. RETRACT TAKE-UP MECHANISM REMOVAL
- 4.4.5.1. FRONT STOP SPREADER REMOVAL
- 4.4.5.2. CROWN CUSHION (WITH PRE-ASSEMBLED CUSHION STACK)
- 4.4.5.3. DIPPER PADLOCK
- 4.4.6. DIPPER TRIP ASSEMBLY
- 4.4.7. A-FRAME
- 4.4.8. BOOM STRUCTURAL STANDS
- 4.4.9. WIRE RUNNING ROPES
- 4.4.9.1. INSPECTION
- 4.4.10. HOIST ROPE REEVING
- 4.4.11. RETRACT ROPE REEVING
- 4.4.12. CROWD ROPE REEVING
- 4.4.13. DIPPER TRIP ROPE REEVING
- 5. AIR SYSTEM
- 5.1. GENERAL MAINTENANCE
- 5.1.1. GENERAL
- 5.1.2. AIR COMPRESSOR (QUINCY QSB20)
- 5.1.3. AIR LINES
- 5.1.4. AIR TANK
- 5.1.5. AIR LINE LUBRICAOTR
- 5.1.6. AIR LINE FILTER
- 5.1.7. AIR LINE REGULATOR
- 5.1.8. AIR DRYER (OPTIONAL)
- 5.1.9. AIR/LUBE SWIVEL ASSEMBLY
- 5.1.10. PRESSURE SWITCHES
- 5.1.11. SOLENOID VALVES
- 5.2. COMPONENT MAINTENANCE
- 5.2.1. AIR COMPRESSOR (QUINCY QSB20)
- 5.2.2. COMPRESSOR OPERATION
- 5.2.3. STARTING THE COMPRESSOR
- 5.2.4. STOPPING THE COMPRESSOR
- 5.2.5. PREPARING FOR MAINTENANCE OR SERVICE
- 5.2.6. SERVICING
- 5.2.7. ASSEMBLY AND DISASSEMBLY OF COMMON WEARING PARTS
- 5.2.8. DRIVE BELT REPLACEMENT
- 5.2.9. AIR/LUBE SWIVEL ASSEMBLY
- 5.2.10. AIR DRYER
- 6. LUBRICATION
- 6.1. GENERAL LUBRICATION
- 6.1.1. LOWER WORKS
- 6.1.2. ROTATING DECK
- 6.1.3. FRONT END
- 6.1.4. LUBRICATION BENCHMARKS
- 6.1.4.1. MULTI-PURPOSE TYPE GREASE (MPG)
- 6.1.4.2. AIR COMPRESSOR (PISTON TYPE) LUBRICANT (ACPL)
- 6.1.4.3. MULTI-PURPOSE OIL (MPO)
- 6.1.4.4. OPEN GEAR LUBRICANT (OGL)
- 6.1.4.5. REGULAR TYPE GEAR LUBRICANT (RGL)
- 6.1.4.6. ROLLER CIRCLE RAIL LUBRICANT (RCRL)
- 6.1.4.7. RUNNING WIRE ROPE LUBRICANT (RWRL)
- 6.1.4.8. STRUCTURAL STRAND AND STATIONARY WIRE ROPE LUBRICANT (SWRL)
- 6.1.5. LUBRICATION CHARTS
- 6.2. AUTOMATIC LUBRICATION SYSTEMS
- 6.2.1. INSPECTION
- 6.2.2. LUBE SYSTEM
- 6.2.3. AIR PUMP SERVICE
- 6.2.4. LINES AND CONTROL SERVICE
- 6.2.5. INJECTORS AND SPRAY NOZZLES
- 6.2.6. STARTUP OF AUTOMATIC LUBRICATION SYSTEMS
- 7. TROUBLESHOOTING
- 7.1. LOWER WORKS
- 7.1.1. CRAWLER
- 7.1.2. THIRD INTERMEDIATE PROPEL SHAFT
- 7.1.3. SECOND INTERMEDIATE PROPEL SHAFT
- 7.1.4. FIRST INTERMEDIATE PROPEL SHAFT
- 7.1.5. PROPEL MOTOR SHAFT
- 7.1.6. PROPEL CLUTCH
- 7.1.7. PROPEL BRAKE
- 7.1.8. PROPEL MOTOR, BLOWER AND GEAR CASE
- 7.1.9. SWING RACK TEETH
- 7.1.10. HOUSE ROLLER RAILS
- 7.1.11. HOUSE ROLLERS
- 7.1.12. CENTER PINTLE
- 7.2. ROTATING DECK
- 7.2.1. HOIST MACHINERY
- 7.2.2. HOIST MOTOR PINION SHAFT
- 7.2.3. HOIST INTERMEDIATE SHAFT ASSEMBLY
- 7.2.4. HOIST DRUM ASSEMBLY
- 7.2.5. CROWD MACHINERY
- 7.2.6. CROWD DRUM GEAR AND PINION LUBRICATION
- 7.2.7. CROWD DISC TYPE BRAKE
- 7.2.8. A-FRAME
- 7.2.9. SWING MACHINERY
- 7.3. FRONT END EQUIPMENT
- 7.3.1. DIPPER-PIN CONNECTED
- 7.3.2. DIPPER DOOR SNUBBERS
- 7.3.3. DIPPER HANDLE
- 7.3.4. AIR/LUBE SWIVEL
- 7.4. AIR STSTEM
- 7.4.1. QUINCY QSB20 SCREW COMPRESSOR
- 8. APPENDICES
- 8.1. APPENDIX A1-GEAR INSPECTION
- 8.2. APPENDIX A2-BOLT TORQUING
- 8.2.1. TORQUE WRENCH METHOD
- 8.2.2. TURN-OF-THE-NUT METHOD
- 8.3. APPENDIX A3-MAINTENANCE WELDING
- 8.3.1. PRINCIPAL STRUCTURES
- 8.3.1.1. GENERAL
- 8.3.2. MAINTENANCE WELDING
- 8.3.2.1. STRUCTURAL MATERIALS
- 8.3.2.2. WELDING ELECTRODES
- 8.3.2.3. PREHEAT REQUIREMENTS
- 8.3.2.4. REMOVAL OF CRACKS
- 8.3.2.5. WELD GROOVE PREPARATION
- 8.3.3. BUTTER WELDING
- 8.3.3.1. WELDING TECHNIQUE
- 8.3.3.2. WELD INSPECTION
- 8.3.3.3. REPAIR OF BROKEN PARTS
- 8.3.4. DIPPER HANDLES
- 8.3.4.1. MAINTENANCE WELDING
- 8.3.4.2. FLAME STRAIGHTENING BENT TUBE
- 8.3.5. WELDING TUBE WITHOUT BACKING RING
- 8.3.5.1. WELDING TUBE USING BACKING RING
- 8.3.5.2. HANDLE END CASTING REPLACEMENT
- 8.3.5.3. TUBE REPLACEMENT
- 8.3.5.4. STRESS RELIEVING WELDED TUBE
- 8.3.6. REPAIR WELDING OF SWING RACKS
- 8.3.6.1. CRACK REPAIR WELDING
- 8.3.6.2. BROKEN TOOTH REPAIR WELDING
- 8.3.7. CRAWLER FRAME TO TRUCK FRAME WELDING
- 8.3.8. SWING RACK TO TRUCK FRAME WELDING
- 8.4. APPENDIX A4-PINION, BRAKE DRUM AND COUPLING INSTALLATION
- 8.5. APPENDIX A5-PREVENTIVE MAINTENANCE CHECKLISTS
- 8.5.1. VISUAL WEEKLY CHECKLIST
- 8.5.2. VISUAL MONTHLY CHECKLIST
- 8.5.3. VISUAL SEMI-ANNUAL CHECKLIST
- 8.6. APPENDIX A6-ROLLER REPLACEMENT
- 8.7. APPENDIX A7-BRAKE OR CLUTCH MAINTENANCE CHECKLIST
- 8.8. APPENDIX A8-ROLLER CIRCLE REPAIR MODIFICATION
- 8.9. APPENDIX A9-SHIMMING INSTRUCTIONS
- 8.10. APPENDIX A10-DRIVE TUMBLER REBUILD PROCEDURE
- 8.11. APPENDIX A11-ELECTRIC MINING SHOVEL BREAK-IN INSTRUCTIONS
- 8.12. APPENDIX A12-MOTOR COUPLING ALIGNMENT
- 8.13. APPENDIX A13-FIGURE TO G.A. DRAWING CROSS REFERENCE










