Bucyrus 495HD Mining Shovel Maintenance And Operation Manual BI619546
$30.00
- Type Of Manual: Maintenance And Operation Manual
- Manual ID: BI619546
- Number of Pages: 498
- Size: 12.5MB
- Format: PDF
Product details
-
Model List:
- 495HD Mining Shovel
- 1. Safety Precautions
- 1.1. General Precautions
- 1.2. Maintenance Precautions
- 1.3. Operating Precautions
- 1.4. Fire Prevention
- 1.5. Warning Signs And Decals
- 2. Introduction
- 3. General Information
- 3.1. SWINGING RESTRAINT BALLAST BOX SUPPORT
- 3.1.1. Ballast Box Support
- 3.1.2. Swinging Restraint
- 4. Machine Overview
- 5. Lower Works
- 5.1. Crawlers
- 5.2. Truck Frame
- 5.3. Swing Rack
- 5.4. Roller Circle
- 5.5. Propel Machinery
- 5.6. Collector Rings
- 6. Rotating Deck
- 6.1. Revolving Frame
- 6.2. Center Pintle
- 6.3. Deck Extensions
- 6.4. Ballast Box
- 6.5. Machinery House
- 6.5.1. Vertical Boarding Ladder, Left
- 6.6. Boarding Stairs
- 6.7. A-Frame
- 6.8. Hoist Machinery
- 6.9. Swing Machinery
- 6.10. Crowd Machinery
- 6.11. Operators Cab
- 6.12. Compressed Air System
- 6.13. Automatic Lubrication System
- 7. Front End Equipment
- 7.1. Suspension Strands
- 7.2. Running Ropes
- 7.3. Saddle Block
- 7.4. Dipper Handle
- 7.5. Padlocks
- 7.6. Dipper Trip
- 8. Typical Machine Specifications
- 9. General Estimated Component Weights
- 9.1. Lower Works
- 9.2. Upper Works
- 9.3. Front End
- 10. Operation
- 11. General Information
- 11.1. Operation Near Electrical Lines
- 12. Controls
- 12.1. Primary Operating Controls
- 12.1.1. Controls On The Left Console
- 12.1.2. Controls On The Right Console
- 13. Operators Seat
- 14. Operators Display
- 14.1. Display Area and Indicators
- 14.2. Display Screens
- 15. Auxiliary Controls
- 15.1. Remote Start Panel
- 15.1.1. Phase Sequence Light
- 15.1.2. Drive Cabinets Temperature Light
- 15.1.3. PLC Power On Light
- 15.1.4. System Ready Light
- 15.1.5. Auxiliary Ground Fault Light
- 15.1.6. Incomplete Sequence Light
- 15.1.7. System Run Pushbutton
- 15.1.8. Air Compressor Start/Stop Pushbuttons
- 15.1.9. House Light Circuit Breakers
- 15.1.10. Lighting Transfer Switch
- 15.2. Lubrication Control Panel
- 15.3. Windshield Wipers
- 15.4. Windshield Washer
- 16. Pre-start Checks
- 16.1. Walk-around Ground Level Inspection
- 16.2. On-board Inspection
- 17. Start-up, Operation And Shutdown
- 17.1. Machine Start-up
- 17.2. Restarting After An Electrical Fault
- 17.3. Machine Operation
- 17.4. Machinery Motions
- 17.4.1. Hoist Motion
- 17.4.2. Crowd Motion
- 17.4.3. Propel Motion
- 17.4.4. Swing Motion
- 17.4.5. Steering
- 17.4.6. Positioning the Machine
- 17.4.7. Start Of The Dig Cycle
- 17.4.8. Engaging The Bank
- 17.4.9. Slope Limitations
- 17.5. Excavated Material
- 17.6. Operation Checks
- 17.7. Operating Hints
- 17.8. Stopping the Machine
- 17.9. Shutdown
- 18. Lubrication
- 19. Lubrication Principles
- 20. Greasing Main A.C. Drive Motors
- 20.1. Type of Grease
- 20.2. Initial Commissioning
- 20.3. Maintenance
- 20.4. Regreasing Intervals
- 21. Lubricant Selection
- 22. Oil Fill Capacities
- 22.1. Types Of Lubricants And Capacities Guidelines
- 22.1.1. Quantities for First Fill of Lubricants
- 23. Automatic Lubrication System
- 23.1. Lube Room
- 23.2. Lube Reservoir fill / Overflow Plumbing
- 23.2.1. Auto Lube Control Panel
- 23.3. Lower Works Lubrication
- 23.4. Propel Machinery Lubrication
- 23.4.1. Lubricant Replacement/sampling
- 23.5. Revolving Frame Lubrication
- 23.6. Hoist Machinery Lubrication
- 23.6.1. Hoist Gearcase Oil Cooler
- 23.7. Crowd Machinery Lubrication
- 23.8. SWING MACHINERY LUBRICATION
- 23.9. Air Compressor Lubrication
- 23.10. Front End Lubrication
- 23.11. Lincoln Type SL-1 Lubricant Injectors
- 23.11.1. SL-1 Lubricant Injector Operation
- 23.11.2. Injector Advantages
- 24. Lubrication Benchmarks
- 24.1. Air Compressor Lubricant
- 24.2. MPO – Multipurpose OIL
- 24.3. RWRL – Running Wire Rope Lubricant
- 24.4. EGL – Enclosed Gearcase Lubricant
- 24.5. MPG – Multipurpose Grease
- 24.6. OGL – Open Gear Lubricant
- 24.7. Certified Lubricants Listing
- 25. Preventive Maintenance
- 26. Introduction
- 26.1. Preventive Maintenance Program
- 26.2. Elements of an Effective Maintenance Program
- 26.3. Scheduled Preventive Maintenance Program
- 26.4. General Safety Considerations
- 27. Maintenance During Machine Operation
- 27.1. Maintenance Precautions
- 28. Preventive Maintenance for Lubrication
- 28.1. Lubricant Cleanliness
- 29. Frequency of Inspection and Maintenance
- 30. Maintenance Schedules
- 30.1. Maintenance Inspection Check Points
- 30.1.1. Every 100 Hours or Weekly
- 30.1.2. Every 500 Hours Or Monthly
- 30.1.3. Every 1250 Hours or Quarterly
- 30.1.4. Every 2500 Hours or Semi-Annually
- 30.1.5. Hours or Annually
- 31. Major Component Locations
- 32. Service Procedures
- 33. Lower Works
- 33.1. Propel Machinery
- 33.2. Crawler Frames and Truck Frame
- 33.2.1. Crawler Belts
- 33.2.2. Crawler Links
- 33.2.3. Upper Rollers
- 33.2.4. Lower Rollers
- 33.2.5. Drive Tumbler
- 33.2.6. Tumbler Drive Shaft
- 33.3. Propel Motor
- 33.4. Propel Planetary Gearcase
- 33.5. Swing Rack
- 33.6. Roller Circle
- 33.6.1. Roller Circle Repair
- 33.7. Swing Rack Dust Curtains
- 33.8. Center Pintle
- 33.8.1. Center Pintle Adjustment
- 33.8.2. Center Pintle Sleeve Removal
- 33.9. Collector Rings
- 33.9.1. Collector Ring Inspection
- 33.9.2. Collector Ring Repair
- 34. Swing Machinery
- 34.1. Swing Blower
- 34.2. Swing Motor
- 34.2.1. Swing Motor Removal
- 34.2.2. Swing Motor Installation
- 34.3. Swing Planetary Gearcase
- 34.3.1. Gearcase Inspection
- 34.4. Swing Shafts and Pinions
- 34.4.1. Swing Pinion Removal
- 34.5. Swing Pinion Installation
- 34.6. Swing Shaft Removal
- 34.6.1. Swing Shaft Installation
- 35. Hoist Machinery
- 35.1. Hoist Motor
- 35.2. Hoist Gearcase Assembly
- 35.2.1. Hoist Gearcase Installation
- 35.2.2. Hoist Gearcase Repair
- 35.2.3. Motor Coupling Shaft
- 35.2.4. Hoist Drum Assembly
- 35.3. Hoist Mounting Bolts
- 35.4. Hoist Limit Switch
- 35.5. Hoist Motor
- 36. Crowd Machinery
- 36.1. Gearcase Repair
- 37. Crowd Motor
- 37.1. Crowd Gear and Drum
- 37.2. Crowd Drum Removal
- 38. Machinery House
- 38.1. Walkways, Stairways, and Handrails
- 38.1.1. Vertical Boarding Ladder, left
- 38.2. Boarding Stairs
- 39. Front End Equipment
- 39.1. Boom Assembly
- 39.1.1. Boom Repair
- 39.2. Boom Limit Switch
- 39.2.1. Limit Switch Inspection
- 39.2.2. Limit Switch Adjustment
- 39.3. Boom Point Sheaves
- 39.3.1. Boom Point Sheave Removal and Disassembly
- 39.3.2. Boom Point Sheave Reassembly and Installation
- 39.4. Boom Bumper
- 39.5. Saddle Block
- 39.5.1. Saddle Block Repair
- 39.5.2. Saddle Block Removal
- 39.6. Dipper Handle
- 39.6.1. Dipper Handle Removal
- 39.6.2. Retract Rope Take-up Mechanism
- 39.6.3. Spreader Repair
- 40. Dipper Assembly
- 40.1. Latch Bar Adjusting
- 40.2. Dipper Door bumpers
- 40.2.1. Dipper Door Snubbers
- 40.3. Dipper Padlock
- 40.4. Dipper Pitch Brace
- 40.5. Dipper Trip Assembly
- 40.6. A-Frame
- 40.7. Auxiliary Winch
- 40.8. Hoist Rope Support Roller
- 40.9. Boom Support Ropes
- 40.10. Wire Ropes
- 40.10.1. Wire Rope Inspection
- 40.11. Hoist Rope Reeving Replacement
- 40.11.1. Crowd Rope Reeving Replacement
- 41. Retract Rope Reeving Replacement
- 41.1. Retract Rope Tightening
- 41.2. Dipper Trip Rope Reeving Replacement
- 41.3. Hoist and Crowd Limit Systems
- 41.3.1. Setting Limits In The Hoist Crowd System
- 42. Brakes and Couplings
- 42.1. Disc Brake Operation
- 42.2. Maintenance
- 42.3. Brake Adjustment Specifications
- 42.4. Hoist Brake
- 42.4.1. Hoist Brake Adjustment
- 42.4.2. Hoist Brake Installation
- 42.4.3. Hoist Brake Wear Release Switches
- 42.5. Crowd Brake
- 42.5.1. Crowd Brake Installation
- 42.5.2. Crowd Brake Wear Release Switches
- 42.6. Propel Brake
- 42.6.1. Propel Brake Adjustment
- 42.6.2. Propel Brake Installation
- 42.6.3. Tachometer Mounting Alignment
- 42.7. Swing Brake
- 42.7.1. Swing Brake Installation
- 42.7.2. Swing Brake Wear Release Switches
- 42.7.3. Swing Brake Burnishing
- 42.8. Spring Replacement All Brakes
- 42.9. Friction Disc Replacement All Brakes
- 42.10. O-Ring Replacement All Brakes
- 42.11. Brake Wear Release Switches Single Disc Brakes
- 42.12. Brake Wear Release Switches Multiple Disc Brakes
- 43. Couplings
- 43.1. Grid Couplings
- 43.1.1. Lubrication
- 43.1.2. Coupling Disassembly and Grid Removal
- 43.1.3. Grid Coupling Installation
- 43.1.4. Seal Replacement without Hub Removal
- 43.1.5. Grid Coupling Alignment
- 43.2. Gear Couplings
- 43.2.1. Coupling Installation
- 43.2.2. Gear Coupling Alignment
- 43.2.3. Hoist Coupling Shaft Alignment
- 44. Compressed Air System
- 45. Air Compressor
- 45.1. Lubrication
- 45.2. Fluid Level Check
- 45.3. Fluid Filter
- 45.4. Fluid Change
- 45.5. V-Belt Tension
- 45.6. V-Belt Removal and Replacement
- 45.7. Pressure Switch
- 45.8. Lockout Valves
- 45.9. Safety Warnings
- 46. Air Filtration
- 47. House Filter Fans
- 47.1. Lubrication
- 47.2. Dynavane Air Cleaner
- 47.3. Air Conditioner
- 47.4. Specifications
- 48. Engineering Data
- 49. Capscrew (Bolt) Grade
- 49.1. Bolt Tightening
- 49.1.1. Torque Wrench Method
- 49.1.2. Turn-of-nut Method
- 50. Measurement Systems
- 50.1. Linear Measurements
- 50.2. Area Measurements
- 50.3. Volume Measurements
- 50.4. Torque Measurements
- 50.4.1. Weight Measurements – Conventional
- 51. Split Flange Assembly Procedure
- 52. Wire Locking Capscrews
- 53. Torque Nut Installation
- 53.1. Tightening Procedure for 2-Inch Torque Nut
- 53.2. Tightening Procedure for 2-Inch Torque Nut
- 53.3. Tightening Procedure for 2.5-Inch Torque Nut
- 53.4. Tightening Procedure for 3-Inch Torque Nut
- 54. Expansion Bolt Installation
- 54.1. Tightening Procedures – Expansion Bolts
- 54.1.1. Hoist Torque Rod, Tapered Sleeve 1.0 Inch Torque Nut
- 55. Torque Nut Removal Procedure
- 55.1. Thread Lubrication
- 56. Torque Nut Helpful Hints
- 57. Locking Assemblies
- 57.1. Locking Assembly Removal
- 58. Pinion and Hub Installation
- 58.1. Removal from a Shaft
- 58.2. Mounting a Pinion or Hub on a Shaft
- 58.2.1. Hub Adapter Pre-heat Advance Requirements
- 58.2.2. Motor Coupling Pre-Heat Advance Requirements
- 59. Maintenance Welding
- 59.1. Welding Electrodes
- 59.2. Repair Welding of Cracks
- 59.2.1. Preheat
- 59.2.2. Welding Technique
- 59.3. Repair Welding of Broken Parts
- 59.4. Repair Welding Swing Rack Teeth
- 59.4.1. Preparation
- 59.4.2. Swing Rack Welding Electrodes
- 59.4.3. Preheat
- 59.4.4. Welding Procedure
- 59.5. Welding and Cutting Equipment
- 59.6. Stress Relieving Temperature Measuring Equipment
- 60. Wire Rope Care and Maintenance
- 60.1. Storage
- 60.2. Checking Diameter
- 60.3. Handling Wire Rope
- 60.4. Seizing Wire Rope
- 60.5. End Preparations/Terminations
- 60.6. Wire Rope Clips
- 60.6.1. Wire Rope Clip Application
- 60.6.2. Wedge Sockets
- 60.7. Inspection of Sheaves and Drums
- 60.8. Breaking In a New Wire Rope
- 60.9. Inspection Data
- 60.10. Guideline to Inspections and Reports
- 60.10.1. Wire Rope Inspection Criteria
- 60.11. Seal Installation
- 60.12. Gearcase Sealing
- 61. Schematics
- 62. Schematics – Automatic Lubrication
- 63. Side View
- 64. Deck Plan
- 65. OGL System A B Schematic
- 66. Grease System C Schematic
- 67. Air Schematic










