Bucyrus 495HF Mining Shovel Maintenance And Operation Manual BI619632

$30.00

  • Type Of Manual: Maintenance And Operation Manual
  • Manual ID: BI619632
  • Number of Pages: 660
  • Size: 25.8MB
  • Format: PDF

Product details

  • Model List:

    • 495HF Mining Shovel
  • 1. Safety Precautions
  • 1.1. General Precautions
  • 1.2. Maintenance Precautions
  • 1.3. Operating Precautions
  • 1.4. Warning Signs And Decals
  • 2. Introduction
  • 3. General Information
  • 3.1. SWINGING RESTRAINT BALLAST BOX SUPPORT
  • 3.2. Swinging Restraint
  • 4. Machine Overview
  • 5. Lower Works
  • 5.1. Crawlers
  • 5.2. Truck Frame
  • 5.3. Swing Rack
  • 5.4. Roller Circle
  • 5.5. Propel Machinery
  • 5.6. Collector Rings
  • 6. Rotating Deck
  • 6.1. Revolving Frame
  • 6.2. Center Pintle
  • 6.3. Deck Extensions
  • 6.4. Ballast Box
  • 6.5. Machinery House
  • 6.6. A-Frame
  • 6.7. Hoist Machinery
  • 6.8. Swing Machinery
  • 6.9. Crowd Machinery Overview
  • 6.10. OPERATORS CAB
  • 6.11. Compressed Air System
  • 6.12. Automatic Lubrication System
  • 6.13. Lube Reservoir fill / Overflow Plumbing
  • 7. Front End Equipment
  • 7.1. Suspension Strands
  • 7.2. Running Ropes
  • 7.3. Saddle Block
  • 7.4. Dipper Handle – Hydraulic Crowd
  • 7.5. Padlocks
  • 7.6. Dipper Trip
  • 8. Typical Machine with HydraCrowd Specifications
  • 9. General Estimated Component Weights
  • 9.1. Lower Works
  • 9.2. Upper Works
  • 9.3. Front End
  • 10. Operation
  • 11. General Information
  • 11.1. Operation Near Electrical Lines
  • 12. Operators Seat
  • 12.1. Adjustable Armrest
  • 12.2. Adjustable Footrest
  • 13. Controls
  • 13.1. Primary Operating Controls
  • 13.2. Controls On The Left Console
  • 13.3. Controls On The Right Console
  • 14. Operators Display
  • 14.1. Display Area and Indicators
  • 14.2. Display Screens
  • 14.3. Lubrication Control Panel
  • 14.4. Fire Suppression System
  • 15. Pre-start Checks
  • 15.1. Walk-around Ground Level Inspection
  • 15.2. On-board Inspection
  • 16. Start-up, Operation And Shutdown
  • 16.1. Machine Start-up
  • 16.2. Restarting After An Electrical Fault
  • 16.3. Machine Operation
  • 16.4. Machinery Motions
  • 16.5. Excavated Material
  • 16.6. Operation Checks
  • 16.7. Operating Hints
  • 16.8. Stopping the Machine
  • 16.9. Shutdown
  • 17. Lubrication
  • 18. Lubrication Principles
  • 19. Greasing Main A.C. Drive Motors
  • 19.1. Type of Grease
  • 19.2. Initial Commissioning
  • 19.3. Maintenance
  • 19.4. Regreasing Intervals
  • 20. Lubricant Selection
  • 21. Oil Fill Capacities
  • 21.1. Types Of Lubricants And Capacities Guidelines
  • 22. Automatic Lubrication System
  • 22.1. Lube Room
  • 22.2. Lube Reservoir fill / Overflow Plumbing
  • 22.3. Lower Works Lubrication
  • 22.4. Propel Machinery Lubrication
  • 22.5. Revolving Frame Lubrication
  • 22.6. Hoist Machinery Lubrication
  • 22.7. Hoist Rope Rollers Lubrication
  • 22.8. Hydraulic Crowd Machinery Lubrication
  • 22.9. Pump Drive Transmission (Pdt)
  • 22.10. Swing Machinery Lubrication
  • 22.11. Air Compressor Lubrication
  • 22.12. Front End Lubrication
  • 22.13. Lincoln Type SL-1 Lubricant Injectors
  • 22.14. Air Compressor Lubricant
  • 23. Hydraulic Cleanliness
  • 23.1. Contamination Control
  • 23.2. Filters
  • 23.3. Moisture Removal
  • 23.4. MPO – Multipurpose OIL
  • 23.5. RWRL – Running Wire Rope Lubricant
  • 23.6. EGL – Enclosed Gearcase Lubricant
  • 23.7. MPG – Multipurpose Grease
  • 23.8. OGL – Open Gear Lubricant
  • 23.9. Certified Lubricants Listing
  • 24. Preventive Maintenance
  • 25. Introduction
  • 25.1. Preventive Maintenance Program
  • 25.2. Elements of an Effective Maintenance Program
  • 25.3. Scheduled Preventive Maintenance Program
  • 25.4. General Safety Considerations
  • 26. Maintenance During Machine Operation
  • 26.1. Maintenance Precautions
  • 27. Preventive Maintenance for Lubrication
  • 27.1. Lubricant Cleanliness
  • 28. Frequency of Inspection and Maintenance
  • 29. Maintenance Schedules
  • 29.1. Maintenance Inspection Check Points
  • 29.2. Hydraulic Crowd Service Schedule
  • 30. Service Procedures
  • 31. Lower Works
  • 31.1. Truck Frame Assembly
  • 31.2. Swing Rack Assembly
  • 31.3. Roller Circle Assembly
  • 31.4. Crawler Belts
  • 31.5. Crawler Side Frame Assembly
  • 32. Propel Assembly
  • 32.1. Installation Notes
  • 32.2. Main Propel Drive Shaft Removal
  • 32.3. Propel Machinery
  • 32.4. Revolving Frame
  • 32.5. Center Pintle
  • 32.6. Collector Rings
  • 33. Rotating Deck
  • 33.1. Swing Machinery
  • 33.2. Hoist Machinery
  • 33.3. Crowd Machinery Overview
  • 33.4. Operators Cab Mounting
  • 33.5. Operators Seat Installation
  • 33.6. Footrest Installation
  • 33.7. Machinery House
  • 33.8. Boom Assembly
  • 33.9. Boom Repair
  • 33.10. Boom Limit Switch Installation
  • 33.11. Boom Point Sheaves
  • 33.12. Boom Bumper
  • 33.13. Saddle Block
  • 33.14. Dipper Handle – Hydraulic Crowd
  • 33.15. LatchFreeTM Dipper Assembly
  • 33.16. Dipper Assembly
  • 34. Dipper Removal Installation
  • 34.1. Dipper Door Snubbers
  • 34.2. Dipper Pitch Brace
  • 34.3. Dipper Padlock
  • 34.4. Dipper Trip Assembly
  • 34.5. A-Frame
  • 34.6. Auxiliary Winch
  • 34.7. Hoist Rope Support Roller
  • 34.8. Boom Support Ropes
  • 34.9. Wire Ropes
  • 34.10. Hoist Rope Reeving Replacement
  • 34.11. Dipper Trip Rope Reeving Replacement
  • 34.12. Hoist and Crowd Limit Systems
  • 35. Brakes and Couplings
  • 35.1. Disc Brake Operation
  • 35.2. Maintenance
  • 35.3. Brake Adjustment Specifications
  • 35.4. Hoist Brake
  • 35.5. Propel Brake
  • 35.6. Swing Brake
  • 35.7. Spring Replacement All Brakes
  • 35.8. Friction Disc Replacement All Brakes
  • 35.9. O-Ring Replacement All Brakes
  • 35.10. Brake Wear Release Switches Single Disc Brakes
  • 35.11. Brake Wear Release Switches Multiple Disc Brakes
  • 36. Couplings
  • 36.1. Grid Couplings
  • 36.2. Gear Couplings
  • 37. Compressed Air System
  • 38. Air Compressor
  • 38.1. Lockout Valves
  • 38.2. Safety Warnings
  • 39. Air Filtration
  • 40. House Filter Fans
  • 40.1. Lubrication
  • 40.2. Dynavane Air Cleaner
  • 41. Air Conditioner
  • 41.1. Specifications
  • 42. Engineering Data
  • 43. Capscrew (Bolt) Grade
  • 43.1. Bolt Tightening
  • 44. Measurement Systems
  • 44.1. Linear Measurements
  • 44.2. Area Measurements
  • 44.3. Volume Measurements
  • 44.4. Torque Measurements
  • 45. Split Flange Assembly Procedure
  • 46. Wire Locking Capscrews
  • 47. Torque Nut Installation
  • 48. Expansion Bolt Installation
  • 48.1. Tightening Procedure for 1.25-Inch Torque Nut
  • 48.2. Tightening Procedure for 1.5-Inch Torque Nut
  • 48.3. Tightening Procedure for 2-Inch Torque Nut
  • 48.4. Tightening Procedure for 2-Inch Torque Nut
  • 48.5. Tightening Procedure for 3.5-Inch Torque Nut
  • 48.6. Procedure For Use Of Mechanical Tensioner On 3.5 Inch Crawler Rods
  • 48.7. Tightening Procedures – Expansion Bolts
  • 49. Torque Nut Removal Procedure
  • 49.1. Thread Lubrication
  • 50. Torque Nut Helpful Hints
  • 51. Locking Assemblies
  • 51.1. Installation, Series B115
  • 51.2. Removal, Series B115
  • 51.3. Locking Assembly Removal
  • 51.4. Pinion and Hub Installation
  • 51.5. Removal from a Shaft
  • 51.6. Mounting a Pinion or Hub on a Shaft
  • 52. Maintenance Welding
  • 52.1. Welding Electrodes
  • 52.2. Repair Welding of Cracks
  • 52.3. Repair Welding of Broken Parts
  • 52.4. Repair Welding Swing Rack Teeth
  • 52.5. Welding and Cutting Equipment
  • 52.6. Stress Relieving Temperature Measuring Equipment
  • 53. Wire Rope Care and Maintenance
  • 53.1. Storage
  • 53.2. Checking Diameter
  • 53.3. Handling Wire Rope
  • 53.4. Seizing Wire Rope
  • 53.5. End Preparations/Terminations
  • 53.6. Wire Rope Clips
  • 53.7. Inspection of Sheaves and Drums
  • 53.8. Breaking In a New Wire Rope
  • 53.9. Inspection Data
  • 53.10. Guideline to Inspections and Reports
  • 53.11. Seal Installation
  • 53.12. Gearcase Sealing
  • 54. Hydraulic Crowd Service Procedures
  • 55. Hydraulic System Cleanliness
  • 56. Hydraulic System Oil Contamination Guide
  • 56.1. Crowd Machinery Overview
  • 57. Hydraulic Crowd Cylinder Overview
  • 58. Cylinder Control Manifold Overview
  • 59. Auxiliary Power Unit Overview
  • 60. Power Module/lower Tank Overview
  • 61. Lower Tank, Crowd Motor, Transmission Pumps Overview
  • 62. Flushing/pdt Lube Motor Overview
  • 63. Circulation Filter Overview
  • 64. Manifolds Overview
  • 65. Oil Circulation Manifold Overview
  • 66. Pump Control Manifold Overview
  • 67. Upper Hydraulic Tank Overview
  • 68. Oil Circulation Pump Overview
  • 69. Isolator Tank Overview
  • 70. Oil Cooler Plumbing Overview
  • 71. Hydraulic Crowd Sensor Locations
  • 71.1. Cylinder Sensors
  • 71.2. Power Module Sensors
  • 71.3. Upper Hydraulic Tank Sensors
  • 71.4. Pump Control Manifold Sensor
  • 71.5. Auxiliary Power Unit Sensor
  • 72. Inspection
  • 73. Pdt Leak Inspection
  • 74. Circulation Plumbing Inspection
  • 75. Oil Circulation Pump Inspection
  • 76. Isolator Troubleshooting
  • 77. Isolator Tank Inspection
  • 78. Isolator Manifold Inspection
  • 79. Vacuum Breaker Inspection
  • 80. Isolator Plumbing Inspection
  • 81. Service Procedures
  • 82. Hydraulic Crowd Start-up Procedure
  • 83. Standard System Flushing Filtration
  • 84. Complete System Flushing Filtration
  • 85. Initial System Oil Fill
  • 86. System Top Off
  • 87. System Oil Drain – Partial
  • 88. System Oil Drain – Complete
  • 89. Auxiliary Power Unit Fill Filter Replacement
  • 90. Pdt – Initial Oil Fill
  • 91. Pdt – Oil Top Off
  • 92. Pdt – Oil Level Check
  • 93. Pdt – Oil Drain
  • 94. Hydraulic Crowd Cooler Cleaning
  • 95. Purging The Main Pumps
  • 96. Hydraulic System Prefill Filter Replacement
  • 97. Upper Tank Return Filter Cleaning Replacement
  • 98. Isolator Removal And Replacement
  • 99. Isolator Draining
  • 100. Circulation Filter Replacement
  • 101. Boom Pressure Hose Removal Installation
  • 102. Pressure Hose Positioning
  • 103. Boom Return Hose Removal Installation
  • 104. Return Hose Positioning
  • 105. Main Pump Pressure Hose Removal Installation
  • 105.1. Hydraulic Crowd Service Schedule
  • 106. Schematics
  • 107. Schematics
  • 108. Side View
  • 109. Deck Plan
  • 110. OGL System A B Schematic
  • 111. Grease System C Schematic
  • 112. Air Schematic
  • 113. Hydraulic Crowd Troubleshooting Schematics
  • 114. _5-31z.pdf
  • 115. _5-31z.pdf
Rate this product