Bucyrus 495HR2 Mining Shovel Maintenance Manual BI619857
$30.00
- Type Of Manual: Maintenance Manual
- Manual ID: BI619857
- Number of Pages: 500
- Size: 14.9MB
- Format: PDF
Product details
-
Model List:
- 495HR2 Mining Shovel
- 1. Safety Precautions
- 1.1. General Precautions
- 1.2. Maintenance Precautions
- 1.3. Operating Precautions
- 1.4. Fire Prevention
- 1.5. Warning Signs And Decals
- 2. Introduction
- 2.1. Swinging Restraint Ballast Box Support
- 2.2. Ballast Box Support
- 2.3. Swinging Restraint
- 3. Machine Overview
- 4. Lower Works
- 4.1. Crawlers
- 4.2. Truck Frame
- 4.3. Swing Rack
- 4.4. Roller Circle
- 4.5. Propel Machinery
- 4.6. Collector Rings
- 5. Rotating Deck
- 5.1. Revolving Frame
- 5.2. Center Pintle
- 5.3. Deck Extensions
- 5.4. Ballast Box
- 5.5. Machinery House
- 5.5.1. Boarding Stairs
- 5.6. A-Frame
- 5.7. Hoist Machinery
- 5.8. Swing Machinery
- 5.9. Crowd Machinery
- 5.10. OPERATORS CAB
- 5.11. Compressed Air System
- 5.12. Automatic Lubrication System
- 5.13. Lube Reservoir fill / Overflow Plumbing
- 6. Front End Equipment
- 6.1. Suspension Strands
- 6.2. Running Ropes
- 6.3. Saddle Block
- 6.4. Dipper Handle
- 6.5. Padlocks
- 6.6. Dipper Trip
- 7. Typical Machine Specifications
- 8. General Estimated Component Weights
- 8.1. Lower Works
- 8.2. Upper Works
- 8.3. Front End
- 9. Lubrication
- 10. Greasing Main A.C. Drive Motors
- 10.1. Type of Grease
- 10.2. Initial Commissioning
- 10.3. Maintenance
- 10.4. Regreasing Intervals
- 11. Lubricant Selection
- 12. Oil Fill Capacities
- 12.1. Types Of Lubricants And Capacities Guidelines
- 12.1.1. Quantities for First Fill of Lubricants
- 13. Automatic Lubrication System
- 13.1. Lube Room
- 13.2. Lube Reservoir fill / Overflow Plumbing
- 13.2.1. Auto Lube Control Panel
- 13.3. Lower Works Lubrication
- 13.4. Propel Machinery Lubrication
- 13.4.1. Lubricant Replacement/sampling
- 13.5. Revolving Frame Lubrication
- 13.6. Hoist Machinery Lubrication
- 13.6.1. Hoist Oil Cooler
- 13.6.2. Filter Element Cleaning
- 13.7. Hoist Rope Rollers Lubrication
- 13.7.1. Oil Pump
- 13.8. Crowd Machinery Lubrication
- 13.9. Swing Machinery Lubrication
- 13.10. Air Compressor Lubrication
- 13.11. Crowd Rope Take-up Mechanism Lubrication
- 13.12. Front End Lubrication
- 13.13. Lincoln Type SL-1 Lubricant Injectors
- 13.13.1. SL-1 Lubricant Injector Operation
- 13.13.2. Injector Advantages
- 13.14. ACSL – Air Compressor (Screw-Type) Lubricant
- 13.15. MPO – Multipurpose OIL
- 13.16. RWRL – Running Wire Rope Lubricant
- 13.17. EGL – Enclosed Gearcase Lubricant
- 13.18. MPG – Multipurpose Grease
- 13.19. OGL – Open Gear Lubricant
- 13.20. Certified Lubricants Listing
- 14. Preventive Maintenance
- 14.1. Preventive Maintenance Program
- 14.2. Elements of an Effective Maintenance Program
- 14.3. Scheduled Preventive Maintenance Program
- 14.4. General Safety Considerations
- 15. Maintenance During Machine Operation
- 15.1. Maintenance Precautions
- 16. Preventive Maintenance for Lubrication
- 16.1. Lubricant Cleanliness
- 17. Frequency of Inspection and Maintenance
- 17.1. Maintenance Inspection Check Points
- 17.1.1. Every 100 Hours or Weekly
- 17.1.2. Every 500 Hours Or Monthly
- 17.1.3. Every 1250 Hours or Quarterly
- 17.1.4. Every 2500 Hours or Semi-Annually
- 17.1.5. Hours or Annually
- 18. Major Component Locations
- 19. Service Procedures
- 19.1. Truck Frame Assembly
- 19.2. Swing Rack Assembly
- 19.2.1. Roller Circle Rail Replacement – Lower
- 19.2.2. Roller Circle Rail Replacement – Upper
- 19.3. Roller Circle Assembly
- 19.3.1. Roller Circle Adjustment
- 19.3.2. Adjustment Procedure
- 19.3.3. Run-in Procedure for the Roller Circle
- 19.3.4. Roller Circle Segment Removal
- 19.3.5. Roller Circle – Roller Replacement
- 19.4. Crawler Belts
- 19.4.1. Crawler Belt Maintenance
- 19.5. Crawler Side Frame Assembly
- 19.5.1. Crawler Side Frame Maintenance
- 19.5.2. Slide Bar Replacement
- 19.6. Crawler Front Idler Roller Assembly
- 19.6.1. Load and Idler Rollers
- 19.7. Propel Assembly
- 19.7.1. Installation Notes
- 19.7.2. Main Propel Drive Shaft Removal
- 19.7.3. Main Propel Shaft – Disassembly
- 19.7.4. Tumbler Rebuild Procedure
- 19.8. Propel Machinery
- 19.8.1. Propel Gearcase Removal
- 19.8.2. Propel Gearcase Installation
- 19.8.3. Propel Planetary Gearcase
- 19.8.4. Propel Motors
- 20. Rotating Deck
- 20.1. Revolving Frame
- 20.2. Center Pintle
- 20.2.1. Center Pintle Adjustment
- 20.2.2. Center Pintle Sleeve Removal
- 20.3. Collector Rings
- 20.3.1. Collector Ring Inspection
- 20.3.2. Collector Ring Repair
- 20.4. Swing Machinery
- 20.4.1. Swing Support Mounting Bolts
- 20.4.2. Swing Motor
- 20.4.3. Swing Planetary Gearcase
- 20.4.4. Swing Pinion Shafts
- 20.5. Hoist Machinery
- 20.5.1. Hoist Motor Removal
- 20.5.2. Motor Coupling Shaft
- 20.5.3. Hoist Gearcase Assembly
- 20.5.4. Hoist Gearcase Repair
- 20.5.5. Hoist Drum Assembly
- 20.5.6. Hoist Oil Cooler
- 20.5.7. Hoist Mounting Bolts
- 20.5.8. Hoist Limit Switch
- 20.6. Crowd Machinery
- 20.7. Gearcase Repair
- 20.7.1. Crowd Gearcase Disassembly
- 20.7.2. Crowd Gearcase Assembly
- 20.7.3. Crowd Motor
- 20.8. Operators Cab Mounting
- 20.9. Joystick Replacement
- 20.9.1. Joystick Calibration
- 20.10. Wiper Arm Replacement
- 20.10.1. Wiper Blade Replacement
- 20.10.2. Wiper Motor Replacement
- 20.11. Machinery House
- 20.12. Walkways, Stairways, and Handrails
- 20.12.1. Boarding Stairs
- 21. Front End Equipment
- 21.1. Boom Assembly
- 21.2. Boom Repair
- 21.3. Boom Limit Switch Installation
- 21.4. Boom Point Sheaves
- 21.4.1. Boom Point Sheave Removal and Disassembly
- 21.4.2. Boom Point Sheave Reassembly and Installation
- 21.5. Boom Bumper
- 21.6. Saddle Block
- 21.6.1. Saddle Block Repair
- 21.6.2. Saddle Block Removal
- 21.7. Dipper Handle
- 21.7.1. Dipper Handle Removal
- 21.7.2. Crowd Rope Take-Up Mechanism
- 21.7.3. Retract Rope Take-up Mechanism
- 21.7.4. Spreader Repair
- 21.8. Dipper Assembly
- 21.8.1. Latch Bar Adjusting
- 21.8.2. Dipper Door bumpers
- 21.8.3. Dipper Removal Installation
- 21.8.4. Dipper Door Snubbers
- 21.8.5. Dipper Pitch Brace
- 21.8.6. Dipper Padlock
- 21.8.7. Dipper Trip Assembly
- 21.9. A-Frame
- 21.10. Auxiliary Winch
- 21.11. Hoist Rope Support Roller
- 21.12. Boom Support Ropes
- 21.13. Wire Ropes
- 21.13.1. Wire Rope Inspection
- 21.14. Crowd Rope Take-up Hydraulic Unit
- 21.15. Hoist Rope Reeving Replacement
- 21.16. Crowd Rope Reeving Replacement
- 21.17. Retract Rope Reeving Replacement
- 21.18. Crowd Rope Tightening
- 21.19. Retract Rope Tightening
- 21.20. Dipper Trip Rope Reeving Replacement
- 21.21. Hoist and Crowd Limit Systems
- 21.21.1. Setting Limits In The Hoist Crowd System
- 22. Brakes and Couplings
- 22.1. Disc Brake Operation
- 22.2. Maintenance
- 22.3. Brake Adjustment Specifications
- 22.4. Hoist Brake
- 22.4.1. Hoist Brake Adjustment
- 22.4.2. Hoist Brake Installation
- 22.4.3. Hoist Brake Wear Release Switches
- 22.5. Crowd Brake
- 22.5.1. Crowd Brake Installation
- 22.5.2. Crowd Brake Wear Release Switches
- 22.6. Propel Brake
- 22.6.1. Propel Brake Adjustment
- 22.6.2. Propel Brake Installation
- 22.6.3. Tachometer Mounting Alignment
- 22.7. Swing Brake
- 22.7.1. Swing Brake Installation
- 22.7.2. Swing Brake Wear Release Switches
- 22.7.3. Swing Brake Burnishing
- 22.8. Spring Replacement All Brakes
- 22.9. Friction Disc Replacement All Brakes
- 22.10. O-Ring Replacement All Brakes
- 22.11. Brake Wear Release Switches Single Disc Brakes
- 22.12. Brake Wear Release Switches Multiple Disc Brakes
- 23. Couplings
- 23.1. Grid Couplings
- 23.1.1. Lubrication
- 23.1.2. Coupling Disassembly and Grid Removal
- 23.1.3. Grid Coupling Installation
- 23.1.4. Seal Replacement without Hub Removal
- 23.1.5. Grid Coupling Alignment
- 23.2. Gear Couplings
- 23.2.1. Coupling Installation
- 23.2.2. Gear Coupling Alignment
- 23.2.3. Hoist Coupling Shaft Alignment
- 24. Compressed Air System
- 24.1. Lockout Valves
- 24.2. Safety Warnings
- 25. Air Filtration
- 25.1. Lubrication
- 25.2. Dynavane Air Cleaner
- 26. Air Filtration System
- 26.1. Description
- 26.2. Operation
- 26.3. Operational Checklist
- 26.3.1. Compressed Air Installation
- 26.3.2. Filter Removal
- 26.3.3. Solid-State Timer Installation
- 26.3.4. Delta P Plus
- 26.3.5. Setpoint Adjustments
- 26.3.6. Delta P Plus Control Calibration
- 26.3.7. Preliminary Start-Up Check
- 26.3.8. Maintenance Information
- 27. Air Conditioner/heater
- 27.1. Evaporator
- 27.2. Condenser
- 27.3. Pressurizer
- 27.3.1. Cleaning The Washable Filter
- 27.4. Specifications
- 28. Engineering Data
- 28.1. Bolt Tightening
- 28.1.1. Torque Wrench Method
- 28.1.2. Turn-of-nut Method
- 29. Measurement Systems
- 29.1. Linear Measurements
- 29.2. Area Measurements
- 29.3. Volume Measurements
- 29.4. Torque Measurements
- 29.4.1. Weight Measurements – Conventional
- 30. Split Flange Assembly Procedure
- 31. Wire Locking Capscrews
- 32. Torque Nut Installation
- 32.1. Tightening Procedure for 1.25-Inch Torque Nut
- 32.2. Tightening Procedure for 2-Inch Torque Nut
- 32.3. Tightening Procedure for 2-Inch Torque Nut
- 32.4. Tightening Procedure for 2-Inch Torque Nut
- 32.5. Tightening Procedure for 2.5-Inch Torque Nut
- 32.6. Tightening Procedure for 3-Inch Torque Nut
- 32.7. Tightening Procedure for 3.5-Inch Torque Nut
- 32.8. Procedure For Use Of Mechanical Tensioner On 3.5 Inch Crawler Rods
- 32.8.1. Initial Tensioning
- 32.8.2. Final Tensioning
- 32.9. Tightening Procedures – Expansion Bolts
- 32.9.1. Rack Roller Torque Rod, Tapered Sleeve 1.0 Inch Torque Nut
- 32.9.2. Hoist Torque Rod, Tapered Sleeve 1.62 Inch Torque Nut
- 32.9.3. Swing Torque Rod Tapered Sleeve 3.25 Inch Torque Nut
- 32.10. Thread Lubrication
- 33. Locking Assemblies
- 33.1. Locking Assembly Removal
- 34. Pinion and Hub Installation
- 34.1. Removal from a Shaft
- 34.2. Mounting a Pinion or Hub on a Shaft
- 34.2.1. Pre-heat Advance Requirements – Pinions and Hubs
- 34.2.2. Motor Coupling Pre-Heat Advance Requirements
- 35. Maintenance Welding
- 35.1. Welding Electrodes
- 35.2. Repair Welding of Cracks
- 35.2.1. Preheat
- 35.2.2. Welding Technique
- 35.3. Repair Welding of Broken Parts
- 35.4. Repair Welding Swing Rack Teeth
- 35.4.1. Preparation
- 35.4.2. Swing Rack Welding Electrodes
- 35.4.3. Preheat
- 35.4.4. Welding Procedure
- 35.5. Welding and Cutting Equipment
- 35.6. Stress Relieving Temperature Measuring Equipment
- 36. Wire Rope Care and Maintenance
- 36.1. Storage
- 36.2. Checking Diameter
- 36.3. Handling Wire Rope
- 36.4. Seizing Wire Rope
- 36.5. End Preparations/Terminations
- 36.6. Wire Rope Clips
- 36.6.1. Wire Rope Clip Application
- 36.6.2. Wedge Sockets
- 36.7. Inspection of Sheaves and Drums
- 36.8. Breaking In a New Wire Rope
- 36.9. Inspection Data
- 36.10. Guideline to Inspections and Reports
- 36.10.1. Wire Rope Inspection Criteria
- 36.11. Seal Installation
- 36.12. Gearcase Sealing
- 37. Schematics
- 38. Side View
- 39. Deck Plan
- 40. HVAC Schematic
- 41. OGL System A B Schematic
- 42. Grease System C Schematic
- 43. Air Schematic
- 44. ServiceProcedures X30.pdf










