Bucyrus Austar BSL Bootend And Crusher Technical Manual BI616742

$30.00

  • Type Of Manual: Technical Manual
  • Manual ID: BI616742
  • Number of Pages: 49
  • Size: 1.9MB
  • Format: PDF

Product details

  • Model List:

    • Austar BSL Bootend And Crusher
  • 1. M00635.pdf
  • 1.1. General Safety
  • 1.1.1. Residual Risk
  • 1.1.2. Supplementary Regulations
  • 1.1.3. PERSONNEL
  • 1.1.3.1. Operation and maintenance
  • 1.1.3.2. Qualification
  • 1.1.4. USE IN CONFORMANCE WITH SPECIFICATIONS
  • 1.1.5. USE CONTRARY TO SPECIFICATIONS
  • 1.1.6. SAFETY INSTRUCTIONS
  • 1.1.6.1. Basic principles
  • 1.1.6.2. Lighting
  • 1.1.6.3. Signalling Systems and Protective Devices
  • 1.1.6.4. Emergency Stop
  • 1.1.6.5. Support Lock-out Switch
  • 1.1.6.6. Moving Parts
  • 1.1.7. STORAGE AND TRANSPORT
  • 1.1.8. HYDRAULICS
  • 1.1.8.1. Handling of Hydraulic Fluids
  • 1.1.8.2. Maintenance and Repair
  • 1.1.8.3. Permissible Hoses
  • 1.1.8.4. Installation of Hydraulic Hoses
  • 1.2. Storage and transport
  • 1.2.1. STORAGE
  • 1.2.1.1. Storing the equipment
  • 1.2.2. TRANSPORT
  • 1.2.2.1. Before transport
  • 1.2.2.2. Transport of the components
  • 1.3. Assembly
  • 1.3.1. PRIOR TO ASSEMBLY
  • 1.3.1.1. Who is allowed to carry out assembly work
  • 1.3.1.2. Assembly notes
  • 1.3.2. ASSEMBLY CRUSHER
  • 1.3.2.1. Installing the individual crusher components into the stageloader
  • 1.3.2.2. Installing the assembled crusher into the stageloader
  • 1.3.3. DISMANTLING
  • 1.4. Introduction
  • 1.4.1. FUNCTIONS AND PURPOSE OF BSL
  • 1.4.2. MAJOR COMPONENTS OF BSL
  • 1.4.2.1. BSL Return Head
  • 1.4.2.2. Minipans
  • 1.4.2.3. BSL Gooseneck
  • 1.4.2.4. Crusher
  • 1.4.2.5. BSL with Roadway Shield
  • 1.4.3. WATER CIRCUIT
  • 1.4.4. GREASING
  • 1.5. Carry Out Start, Stop and Shut-down Procedures – BSL
  • 1.5.1. NORMAL START
  • 1.5.2. TEMPORARY STOP PROCEDURE
  • 1.5.3. NORMAL SHUTDOWN PROCEDURE
  • 1.5.4. BSL START-UP SEQUENCE
  • 1.5.5. RUNNING BSL WITH SLOWRUNNERS
  • 1.6. Fluid Coupling Gearbox Maintenance
  • 1.6.1. CHECKING AND FILLING BSL / CRUSHER FLUID COUPLING
  • 1.6.2. CHECKING AND CHANGING BSL GEARBOX OIL
  • 1.6.2.1. To check the BSL drive oil level
  • 1.6.2.2. To top up oil
  • 1.6.2.3. To drain oil
  • 1.7. Crusher
  • 1.7.1. TECHNICAL DATA
  • 1.7.2. TECHNICAL DATA SHEET
  • 1.7.3. MAIN COMPONENTS
  • 1.7.4. TECHNICAL DESCRIPTION
  • 1.7.4.1. Crusher housing and substructure with crusher pan
  • 1.7.4.2. Impact roll
  • 1.7.4.3. Turn able Impact Head
  • 1.7.4.4. Roll height adjustment
  • 1.7.4.5. Central lubrication
  • 1.7.5. TIGHTENING TORQUES
  • 1.7.5.1. Screws and nuts with metric coarse thread DIN 13
  • 1.7.6. OPERATION
  • 1.7.6.1. Commissioning of the crusher plant
  • 1.7.6.2. Before commissioning
  • 1.7.6.3. Notes for electrics
  • 1.7.7. TEST RUN AND START UP
  • 1.7.8. OPERATION OF THE CRUSHER PLANT
  • 1.7.8.1. General
  • 1.7.8.2. Roll height adjustment
  • 1.8. Bootend
  • 1.8.1. ISOLATING BOOTEND
  • 1.8.2. FUNCTIONS AND PURPOSE OF BOOTEND
  • 1.8.3. MAJOR COMPONENTS OF THE BOOTEND
  • 1.8.4. ROLLER SNUBBER ROLLER
  • 1.8.5. BELT SCRAPER
  • 1.8.6. LIFT CYLINDERS
  • 1.8.7. SIDE SHIFT CYLINDER
  • 1.8.8. ADVANCING CYLINDER
  • 1.8.9. CONTROL BANK
  • 1.9. Carry Out Start, Stop and Shut-down Procedures – Bootend
  • 1.9.1. CONTROL BANK
  • 1.9.2. BOOTEND SEQUENCE OF OPERATION
  • 1.9.3. PERFORM A SIDE SHIFT OPERATION
  • 1.9.4. BOOTEND LINE AND LEVEL
  • 1.9.5. BELT SIGNAL LINE CABLE REALER
  • 1.10. Lubrication Inspections
  • 1.10.1. BOOTEND
  • 1.10.1.1. Greasing
  • 1.10.1.2. Water Circuit
  • 1.10.1.3. Inspection (Shift)
  • 1.10.1.4. Inspection (Daily)
  • 1.10.2. CRUSHER
  • 1.10.2.1. Lubrication
  • 1.10.2.2. Changing or turning the impact heads
Rate this product