Bucyrus Equipment Crawler Units (Size 9) Technical Manual BI616744
$30.00
- Type Of Manual: Technical Manual
- Manual ID: BI616744
- Number of Pages: 50
- Size: 2.1MB
- Format: PDF
Product details
-
Model List:
- Equipment Crawler Units (Size 9)
- 1. M00637.pdf
- 1.1. General Safety
- 1.1.1. PERSONNEL
- 1.1.1.1. Operation
- 1.1.1.2. Installation and repair
- 1.1.2. OPERATING CONDITIONS
- 1.1.2.1. Intended use
- 1.1.2.2. Unauthorised use
- 1.1.3. SAFETY INSTRUCTIONS
- 1.1.3.1. General rules
- 1.1.3.2. Noise emissions
- 1.1.3.3. Condition
- 1.1.3.4. Safety equipment
- 1.1.3.5. Information signs
- 1.1.3.6. Emergency stops
- 1.1.3.7. Block working area
- 1.1.3.8. Moving parts
- 1.1.4. STORAGE AND TRANSPORT
- 1.1.4.1. Transport safety device
- 1.1.4.2. Lifting Equipment
- 1.1.4.3. Floor conveying device
- 1.1.5. ERECTION AND COMMISSIONING
- 1.1.5.1. Environmental acceptability
- 1.1.6. OPERATION
- 1.1.7. MAINTENANCE AND REPAIR
- 1.1.7.1. Original parts
- 1.1.7.2. Safety equipment
- 1.1.8. HYDRAULICS
- 1.1.8.1. Handling of Hydraulic Fluids
- 1.1.8.2. Maintenance and Repair
- 1.1.8.3. Permissible Hoses
- 1.1.8.4. Installation of Hydraulic Hoses
- 1.2. Storage and transport
- 1.2.1. STORAGE
- 1.2.1.1. Corrosion protection
- 1.2.2. STORAGE OF THE EQUIPMENT
- 1.2.2.1. No direct exposure to sunlight
- 1.2.2.2. Dirt and moisture
- 1.2.2.3. Short-term storage
- 1.2.2.4. Long-term storage
- 1.2.2.5. Plastic deformation
- 1.2.2.6. Random sample inspection
- 1.2.2.7. Natural ageing
- 1.2.2.8. HFA fluids
- 1.2.3. TRANSPORT
- 1.2.3.1. Load units dimensions and weights
- 1.2.4. BEFORE TRANSPORT
- 1.2.4.1. Temperatures below freezing
- 1.2.4.2. Electrical and electronic components
- 1.2.5. TRANSPORT OF THE COMPONENTS
- 1.2.5.1. Machine parts
- 1.3. Pump and Transformer Station Crawler Units
- 1.3.1. DESCRIPTION
- 1.4. Towing Crawler Units
- 1.4.1. CONNECT TOWING UNIT TO DRAW BAR
- 1.4.2. DISENGAGE TRACKS
- 1.5. Hooking Up and Driving Track Units
- 1.5.1. TRANSFORMER STATION CONNECTION AND OPERATION
- 1.5.2. PUMP STATION CONNECTION AND OPERATION
- 1.6. Disconnecting the crawler unit
- 1.7. Track Maintenance
- 1.7.1. TENSIONING TRACKS
- 1.7.1.1. General
- 1.7.1.2. Procedure
- 1.7.2. REPLACEMENT OF TRACK TENSIONING CYLINDER
- 1.7.2.1. General
- 1.7.2.2. Procedure
- 1.7.3. REPLACEMENT OF TRACK FROM TRACK FRAME
- 1.7.3.1. General
- 1.7.3.2. Procedure
- 1.7.4. TRACK ASSEMBLY REMOVAL COMPLETE
- 1.7.4.1. General
- 1.7.4.2. Procedure – Removal
- 1.7.4.3. Procedure – Refitting
- 1.8. Oil Filling of Planetary Hubs










