Bucyrus 25M3 Technical Manual BI619315
$30.00
- Type Of Manual: Technical Manual
- Manual ID: BI619315
- Number of Pages: 149
- Size: 5.1MB
- Format: PDF
Product details
-
Model List:
- 25M3
- 1. M01270.pdf
- 1.1. Maintenance Manual Contents
- 1.1.1. Section 1 Machine Description
- 1.1.2. Section 9 Mainframe
- 1.2. Section 1 Machine Description
- 1.2.1. GENERAL DESCRIPTION
- 1.2.1.1. Machine Layout
- 1.2.1.2. Specifications
- 1.2.2. COMPONENT DESCRIPTIONS
- 1.2.2.1. Main Chassis
- 1.2.2.2. Cutting Head Assembly
- 1.2.2.3. Gathering Head Assembly
- 1.2.2.4. Conveyor Assembly
- 1.2.2.5. Traction Drive System
- 1.2.2.6. Hydraulic System
- 1.2.2.7. Water System
- 1.3. Section 2 Operating Instructions
- 1.4. Section 3 Defects,Hazards and Safety
- 1.4.1. GENERAL INFORMATION
- 1.4.1.1. Introduction
- 1.4.1.2. Warnings and Symbols
- 1.4.1.3. Isolation Procedures
- 1.4.1.4. Main Isolator
- 1.4.1.5. Safety Instructions and Precautions
- 1.4.2. Safe and Controlled Zones
- 1.4.3. SAFETY INSTRUCTIONS FOR OPERATIONAL PHASES
- 1.4.3.1. Normal Operation
- 1.4.3.2. Flitting Operation
- 1.4.3.3. Safety Instructions for Maintenance and Repair Procedures
- 1.4.4. HAZARDS
- 1.4.4.1. Electric Energy
- 1.4.4.2. Hydraulics
- 1.4.4.3. Oils, Greases and other Chemicals
- 1.4.5. SAFETY EQUIPMENT
- 1.4.5.1. Emergency Stop Buttons
- 1.4.5.2. Emergency Stop Button Locations
- 1.4.5.3. Transmitter Emergency Stop Switch
- 1.4.5.4. Audible Warnings
- 1.4.5.5. Strobe Lights
- 1.4.5.6. Cutter Head Stops
- 1.4.5.7. Conveyor Boom Stops
- 1.4.5.8. Cutter Stops
- 1.4.5.9. Gathering Head Stops
- 1.4.5.10. Personal Safety Equipment
- 1.4.6. RADIO REMOTE CONTROL SYSTEM
- 1.4.6.1. General
- 1.5. Section 4 General Maintenance
- 1.5.1. GENERAL MAINTENANCE
- 1.5.1.1. Maintenance and the Continuous Miner
- 1.5.1.2. Torques
- 1.5.1.3. Duo-Cone Seals
- 1.5.1.4. Maintenance Guidelines
- 1.5.2. BEARINGS AND GEARS
- 1.5.2.1. Bearings General
- 1.5.2.1.1. Cleanliness
- 1.5.2.1.2. Keep Clean Keep Dry
- 1.5.2.2. Bearing Assembly Methods
- 1.5.2.3. Assembly Methods
- 1.5.2.3.1. Micronized Graphite for Bearing Assembly
- 1.5.2.3.2. Drivers for Bearing Cups and Cones
- 1.5.2.3.3. Heating Bearings
- 1.5.2.3.4. Heating in Oil
- 1.5.2.3.5. Induction Heating
- 1.5.2.4. Freezing/Shrinking Bearing Cups
- 1.5.2.5. Tapered rolling Bearing Adjustment
- 1.5.2.5.1. Thermal Expansion
- 1.5.2.5.2. Torque for Zero End Play
- 1.5.2.6. Bevel Gear Adjustment
- 1.5.3. LOCKWIRING FASTENERS
- 1.5.3.1. Single Wire
- 1.5.3.2. Wired in Pairs
- 1.5.4. SPECIAL FASTENERS
- 1.5.5. SELF-LOCKING SCREWS
- 1.5.6. LOCKNUTS
- 1.5.6.1. Installation Recommendations
- 1.5.7. COMPONENT SUBSTITUTION
- 1.5.8. SAFETY IN MAINTENANCE
- 1.6. Section 5 Cutting Head Assy
- 1.6.1. GENERAL DESCRIPTION
- 1.6.2. CUTTER HEAD
- 1.6.2.1. Cutter Head Gearcase
- 1.6.2.2. Cutter Head Layout
- 1.6.2.3. Cutter Head Oil Check/Fill
- 1.6.3. CUTTER MOTOR TORQUE LIMITING CLUTCH
- 1.6.3.1. Cutter Head Clutch
- 1.7. Section 6 Gathering Head Assy
- 1.7.1. GENERAL DESCRIPTION
- 1.7.2. GATHERING HEAD GEAR CASES
- 1.7.2.1. Gathering Head Gear Case Plan Left Side
- 1.7.2.2. Gathering Head Gear Case Elevation Left Side
- 1.7.3. CONVEYOR CHAIN DISASSEMBLY
- 1.8. Section 7 Conveyor Assy
- 1.8.1. GENERAL DESCRIPTION
- 1.8.2. CONVEYOR CHAIN REMOVAL
- 1.8.3. CONVEYOR CHAIN INSTALLATION
- 1.9. Section 8 Traction System
- 1.9.1. GENERAL DESCRIPTION
- 1.9.2. TRACTION DRIVE GEAR CASES
- 1.9.3. TRACTION BRAKE
- 1.9.3.1. Traction Brake Drawing
- 1.10. Section 9 Mainframe
- 1.10.1. SCRUBBER SYSTEM
- 1.10.1.1. Maintenance
- 1.10.1.2. Engart Fan Drawing
- 1.10.1.3. Photo of Engart Scrubber Screens
- 1.11. Section 10 Servicing And Maintenance.a
- 1.11.1. SERVICING AND MAINTENANCE
- 1.11.2. SERVICING POINTS ON THE 25M3 CONTINUOUS MINER
- 1.11.3. LUBRICATING CHART AND GEAR CASE OIL CAPACITIES
- 1.11.4. LUBRICATION GEAR OIL
- 1.11.4.1. Tram Gear Cases
- 1.11.4.2. Cutter Head Gear Cases
- 1.11.4.3. Cutter Head Input Gear Cases
- 1.11.4.4. Gathering Head (POT) Gear Cases
- 1.11.4.5. Gathering Head Input Gear Cases
- 1.11.4.6. Traction Idler Roller
- 1.11.5. GREASING
- 1.11.6. TRAM BRAKES
- 1.11.7. FILTERS
- 1.11.8. CHAIN ADJUSTMENTS
- 1.11.8.1. Crawler Track Chain Adjustment
- 1.11.9. CHECK AND FILL HYDRAULIC OIL RESERVOIR
- 1.11.9.1. Breather
- 1.11.9.2. Hydraulic Reservoir
- 1.11.9.3. Reservoir Construction
- 1.11.9.4. Photo of Breather and Header Tank
- 1.11.9.5. Hydraulic Oil Power Fill
- 1.11.10. REPAIR OR REPLACE WATERSPRAYS
- 1.11.11. MACHINE CUTTING PICKS
- 1.12. Section 11 Hydraulic components assembly
- 1.12.1. ISOLATION PROCEDURES
- 1.12.2. HYDRAULIC ISOLATION
- 1.12.3. DESCRIPTION
- 1.12.3.1. Reservoir Construction
- 1.12.3.2. Breather
- 1.12.4. HYDRAULIC LAYOUT
- 1.12.5. MECHANICAL
- 1.12.6. HYDRAULICS
- 1.12.6.1. Pilot Hydraulic System (Required with Radio Control)
- 1.12.6.2. Main Hydraulic System
- 1.12.7. HYDRAULIC PUMP
- 1.12.7.1. Tandem Gear Pump
- 1.12.7.2. Operation
- 1.12.8. MAIN RETURN FILTER
- 1.12.9. MAIN PRESSURE FILTER
- 1.12.10. VALVE BANK INFORMATION
- 1.12.11. MAIN RELIEF VALVE
- 1.12.11.1. Valve Bank Main Relief
- 1.12.11.2. Port Relief
- 1.12.12. DIRECTIONAL CONTROL VALVE
- 1.12.12.1. Operation
- 1.12.12.2. Load Hold Check
- 1.12.12.3. Anti-Cavitation Check
- 1.12.13. SOLENOID
- 1.12.13.1. Operation 12 Volt DC Solenoid
- 1.12.14. PILOT OIL FILTER
- 1.12.15. MAIN MANIFOLD BLOCK
- 1.12.16. SHEAR CYLINDER AND GATHERING HEAD MANIFOLD
- 1.12.17. POWER FILL SOLENOID AND MANIFOLD
- 1.12.18. PILOT OPERATED WATER VALVE
- 1.12.18.1. Operation
- 1.12.19. OVER CENTRE VALVE
- 1.12.20. HYDRAULIC CIRCUITS
- 1.12.20.1. Basic Pump and Filtration Circuit
- 1.12.21. STABILISER UP
- 1.12.21.1. Operation
- 1.12.22. STABILISER DOWN
- 1.12.22.1. Operation
- 1.12.23. CONVEYOR SWING LEFT
- 1.12.23.1. Operation
- 1.12.24. CONVEYOR SWING RIGHT
- 1.12.24.1. Operation
- 1.12.25. CONVEYOR LIFT
- 1.12.25.1. Operation
- 1.12.26. CONVEYOR DOWN
- 1.12.26.1. Operation
- 1.12.27. GATHERING HEAD UP
- 1.12.27.1. Operation
- 1.12.28. GATHERING HEAD FLOAT
- 1.12.28.1. Operation
- 1.12.29. SHEAR UP
- 1.12.29.1. Operation
- 1.12.30. SHEAR DOWN
- 1.12.30.1. Operation
- 1.12.31. ADJUSTMENTS
- 1.12.32. HYDRAULIC SYSTEM PRESSURES
- 1.12.33. HYDRAULIC DRAWING
- 1.13. Section 12 Water General
- 1.13.1. WATER RETICULATION
- 1.13.1.1. General
- 1.13.2. WATER SYSTEM OPTIONAL BOOST PUMP
- 1.13.2.1. SCRUBBER SYSTEM
- 1.13.2.2. Tramming
- 1.13.2.3. Water Sprays
- 1.13.3. WATER LAYOUT
- 1.13.3.1. Water Manifold
- 1.13.4. OPERATION
- 1.13.5. WATER SCHEMATIC
- 1.13.6. TESTING NOZZLE PRESSURE
- 1.13.6.1. Equipment Required
- 1.13.6.2. Component Weights
- 1.13.7. TEST PROCEDURE
- 1.13.8. LOCATION FOR TESTING OF WATER PRESSURE
- 1.13.9. Location
- 1.13.10. Description
- 1.13.11. Minimum Pressure
- 1.13.12. Right side Cutter Spray Bar.
- 1.13.13. kpa (200 psi)
- 1.13.14. Right side Top Spray.
- 1.13.15. kpa (200 psi)
- 1.13.16. Right side Spray.
- 1.13.17. kpa (200 psi)
- 1.13.18. Left side Cutter Spray Bar.
- 1.13.19. kpa (200 psi)
- 1.13.20. Left side Top Spray. (optional)
- 1.13.21. kpa (200 psi)
- 1.13.22. Left side Spray. (optional)
- 1.13.23. kpa (200 psi)










