Bucyrus 495HD Mining Shovel Maintenance And Operation Manual BI619559
$30.00
- Type Of Manual: Maintenance And Operation Manual
- Manual ID: BI619559
- Number of Pages: 481
- Size: 14.4MB
- Format: PDF
Product details
-
Model List:
- 495HD Mining Shovel
- 1. _D.pdf
- 1.1. _D.pdf
- 2. _2_pg10.pdf
- 2.1. Table of Contents
- 2.1.1. GENERAL INFORMATION
- 2.1.2. OPERATION NEAR ELECTRICAL LINES
- 2.1.3. OPERATORS CONTROLS
- 2.1.4. Location of the Operating Controls
- 2.1.5. Operators Cab
- 2.1.6. Primary Operating Controls
- 2.1.7. Operators Control Consoles in the Cab
- 2.1.8. Controls on the Left Console
- 2.1.9. LEFT JOYSTICK
- 2.1.10. DIPPER TRIP
- 2.1.11. SIGNAL HORN
- 2.1.12. Hoist Brake
- 2.1.13. Crowd Brake
- 2.1.14. Swing Brake
- 2.1.15. Propel Brake
- 2.1.16. Left Control Console
- 2.1.17. CLIMATE CONTROL PANEL
- 2.1.18. WINDSHIELD WIPER SWITCH
- 2.1.19. WINDSHIELD WASHER SWITCH
- 2.1.20. Controls on the Right Console
- 2.1.21. RIGHT JOYSTICK
- 2.1.22. CONTROL STOP PUSHBUTTON
- 2.1.23. CONTROL RESET PUSHBUTTON
- 2.1.24. Right Control Console
- 2.1.25. DIG/PROPEL Transfer Switch
- 2.1.26. EMERGENCY STOP PUSHBUTTON
- 2.1.27. MAIN POWER OFF PUSHBUTTON
- 2.1.28. EARTH CONTINUITY LOCKOUT PUSHBUTTON
- 2.1.29. TELEPHONE
- 2.1.30. OPERATORS SEAT
- 2.1.31. Operators Seat – Front View
- 2.1.32. OPERATORS DISPLAY
- 2.1.33. Operators Display Panel
- 2.1.34. DISPLAY AREA AND INDICATORS
- 2.1.35. DISPLAY SCREENS
- 2.1.36. Title Screen
- 2.1.37. Language Screen
- 2.1.38. Icon Screen
- 2.1.39. Active Alarm
- 2.1.40. New Alarm
- 2.1.41. Alarms Help
- 2.1.42. Rope Reeving/Pintle Tightening
- 2.1.43. Rope Reeving/Pintle Tightening Help
- 2.1.44. Calibration Limits
- 2.1.45. Limit Calibration Help
- 2.1.46. Fault Counters/Operating Hours
- 2.1.47. PLC Menu Screen
- 2.1.48. Typical Bearing Temperature Screen
- 2.1.49. Operators Screen
- 2.1.50. Auxiliary Controls
- 2.1.51. REMOTE START CONSOLE
- 2.1.52. HOUSE LIGHT CIRCUIT BREAKERS
- 2.1.53. LIGHTING TRANSFER SWITCH
- 2.1.54. LUBRICATION CONTROL PANEL
- 2.1.55. Windshield Wipers
- 2.1.56. Windshield Washer
- 2.1.57. PRE-START CHECKS
- 2.1.58. WALKAROUND GROUND LEVEL INSPECTION
- 2.1.59. ON-BOARD INSPECTION
- 2.1.60. MACHINE START-UP, OPERATION AND SHUTDOWN
- 2.1.61. START-UP
- 2.1.62. Start-Up Control Locations
- 2.1.63. RESTARTING AFTER AN ELECTRICAL FAULT
- 2.1.64. OPERATION
- 2.1.65. Machinery Motions
- 2.1.66. HOIST MOTION
- 2.1.67. CROWD MOTION
- 2.1.68. PROPEL MOTION
- 2.1.69. Propel – Straight Forward/Reverse
- 2.1.70. SWING MOTION
- 2.1.71. PROPER SWING MOTION
- 2.1.72. STEERING
- 2.1.73. COUNTER-ROTATION TURNS
- 2.1.74. POSITIONING THE MACHINE
- 2.1.75. BACK-UP METHOD
- 2.1.76. DRIVE-BY METHOD
- 2.1.77. START OF THE DIG CYCLE
- 2.1.78. Force the Dipper Lip into the Bank
- 2.1.79. Variations on Dipper Penetration
- 2.1.80. Dig with the Dipper Beneath the Boom Point
- 2.1.81. ENGAGING THE BANK
- 2.1.82. Slope Limitations
- 2.1.83. Slope vs. Degrees
- 2.1.84. Rollover and Operation Limits
- 2.1.85. EXCAVATED MATERIAL
- 2.1.86. OPERATION CHECKS
- 2.1.87. OPERATING HINTS
- 2.1.88. STOPPING THE MACHINE
- 2.1.89. Machine SHUTDOWN










