Bucyrus 495HF2 Mining Shovel Service Manual BI624134
$30.00
- Type Of Manual: Service Manual
- Manual ID: BI624134
- Number of Pages: 808
- Size: 54.4MB
- Format: PDF
Product details
-
Model List:
- 495HF2 Mining Shovel
- 1. Table of Contents
- 2. Revision History
- 3. Safety Symbols
- 4. Safety Precautions
- 4.1. General Precautions
- 4.2. Maintenance Precautions
- 4.3. Operating Precautions
- 4.4. Fire Prevention
- 4.5. Fire Prevention
- 4.6. Warning Signs And Decals
- 5. Introduction
- 6. About This Manual
- 6.1. Purpose
- 6.2. Organization
- 6.3. Terminology
- 6.4. Revisions
- 6.5. Precautions and Disclaimers
- 6.6. Contact
- 7. Swinging Restraint Ballast Box Support
- 7.1. Ballast Box Support
- 7.2. Swinging Restraint
- 8. Machine Overview
- 9. Lower Works
- 9.1. Crawlers
- 9.2. Truck Frame
- 9.3. Swing Rack
- 9.4. Roller Circle
- 9.5. Propel Machinery
- 9.6. Collector Rings
- 10. Rotating Deck
- 10.1. Revolving Frame
- 10.2. Center Pintle
- 10.3. Deck Extensions
- 10.4. Ballast Box
- 10.5. Machinery House
- 10.6. A-Frame
- 10.7. Hoist Machinery
- 10.8. Swing Machinery
- 10.9. Crowd Machinery Overview
- 10.10. Operators Cab
- 10.11. Compressed Air System
- 10.12. Automatic Lubrication System
- 10.13. Lube Reservoir Fill / Overflow Plumbing
- 11. Front End Equipment
- 11.1. Suspension Strands
- 11.2. Boom
- 11.3. Running Ropes
- 11.4. Saddle Block
- 11.5. Dipper Handle – Hydraulic Crowd
- 11.6. Dipper
- 11.7. Padlocks
- 11.8. Dipper Trip
- 12. Machine Specifications with HydraCrowd Typical
- 13. General Estimated Component Weights
- 13.1. Lower Works
- 13.2. Upper Works
- 13.3. Front End
- 14. Lubrication
- 15. Lubrication Principles
- 16. Greasing Main A.C. Drive Motors
- 16.1. Type of Grease
- 16.2. Initial Commissioning
- 16.3. Maintenance
- 16.4. Regreasing Intervals
- 17. Lubricant Selection
- 18. Oil Fill Capacities
- 18.1. Types Of Lubricants And Capacities
- 19. Lubricant Replacement/Sampling
- 19.1. Lubricant Change Cycle
- 20. Automatic Lubrication System
- 20.1. Lube Room
- 20.2. Lube Reservoir Fill / Overflow Plumbing
- 20.3. Lower Works Lubrication
- 20.4. Revolving Frame Lubrication
- 20.5. Hoist Rope Rollers Lubrication
- 20.6. Front End Lubrication
- 20.7. Lubricant Injectors
- 21. Propel Machinery Lubrication
- 22. Hoist Machinery Lubrication
- 22.1. Hoist Oil Cooler
- 22.2. Filter Element Cleaning
- 23. Swing Machinery Lubrication
- 24. Air Compressor Lubrication
- 25. Hydraulic Crowd Machinery Lubrication
- 25.1. Pump Drive Transmission (PDT)
- 25.2. Oil Pump
- 26. Hydraulic Cleanliness
- 26.1. Contamination Control
- 26.2. Filters
- 26.3. Moisture Removal
- 26.4. ACSL – Air Compressor (Screw-Type) Lubricant
- 26.5. RWRL – Running Wire Rope Lubricant
- 26.6. EGL – Enclosed Gearcase Lubricant
- 26.7. MPG – Multipurpose Grease
- 26.8. OGL – Open Gear Lubricant
- 27. Preventive Maintenance
- 28. Introduction
- 28.1. Preventive Maintenance Program
- 28.2. Elements of an Effective Maintenance Program
- 28.3. Scheduled Preventive Maintenance Program
- 28.4. General Safety Considerations
- 29. Maintenance During Machine Operation
- 29.1. Maintenance Precautions
- 30. Preventive Maintenance for Lubrication
- 30.1. Lubricant Cleanliness
- 31. Frequency of Inspection and Maintenance
- 32. Maintenance Schedules
- 32.1. Maintenance Inspection Check Points
- 33. Hydraulic Crowd Service Schedule
- 34. HydraCrowd Health Monitoring Checks
- 35. Major Component Locations
- 36. Service Procedures
- 37. Lower Works
- 37.1. Truck Frame Assembly
- 37.2. Swing Rack Assembly
- 37.3. Roller Circle Assembly
- 37.4. Crawler Belts
- 37.5. Crawler Side Frame Assembly
- 37.6. Propel Shaft Assembly
- 37.7. Propel Machinery
- 38. Rotating Deck
- 38.1. Revolving Frame
- 38.2. Center Pintle
- 38.3. Collector Rings
- 38.4. Swing Machinery
- 38.5. Hoist Machinery
- 38.6. Hoist Oil Cooler
- 38.7. Crowd Machinery Overview
- 38.8. Power Module/Lower Hydraulic Tank
- 38.9. Main Pump Replacement
- 38.10. PDT Removal
- 38.11. Pump Timing Installation
- 38.12. Crowd Motor Removal Installation
- 38.13. Tuning Set-up Procedure
- 38.14. Tachometer Removal Installation
- 38.15. Boom Tube Removal Replacement
- 38.16. Power Module Removal
- 38.17. Expansion Joint Tightening Procedure
- 38.18. Oil Circulation Pump Removal Replacement
- 38.19. Flushing/PDT Lube Motor Disassembly Replacement
- 38.20. Operators Cab Mounting
- 38.21. Operators Seat Replacement
- 38.22. Joystick Replacement
- 38.23. Wiper Arm Replacement
- 38.24. Wiper Blade Replacement
- 38.25. Wiper Motor Replacement
- 39. Machinery House
- 39.1. Walkways, Stairways, and Handrails
- 40. Front End Equipment
- 40.1. Boom Assembly
- 40.2. Boom Limit Switch Installation
- 40.3. Boom Point Sheaves
- 40.4. Boom Bumper
- 40.5. Saddle Block
- 40.6. Dipper Handle – Hydraulic Crowd
- 40.7. LatchFreeTM Dipper Assembly
- 40.8. Dipper Removal Installation
- 40.9. Dipper Trip Assembly
- 40.10. A-Frame
- 40.11. Auxiliary Winch
- 40.12. Hoist Rope Support Roller
- 40.13. Boom Support Ropes
- 40.14. Wire Ropes
- 40.15. Hoist Rope Reeving Replacement
- 40.16. Dipper Trip Rope Reeving Replacement
- 40.17. Hoist and Crowd Limit Systems
- 41. Brakes and Couplings
- 42. Brakes
- 42.1. Disc Brake Operation
- 42.2. Maintenance
- 42.3. Brake Adjustment Specifications
- 42.4. Hoist Brake
- 42.5. Propel Brake
- 42.6. Swing Brake
- 42.7. Spring Replacement All Brakes
- 42.8. Friction Disc Replacement All Brakes
- 42.9. O-Ring Replacement All Brakes
- 42.10. Brake Wear Release Switches Single Disc Brakes
- 42.11. Brake Wear Release Switches Multiple Disc Brakes
- 43. Couplings
- 43.1. Grid Couplings
- 43.2. Gear Couplings
- 44. Compressed Air System
- 45. Air Compressor – Dual
- 45.1. Compressor Start-up Procedure
- 45.2. Compressor Shutdown Procedure
- 45.3. Compressor Fluid Level Check
- 45.4. Recommended Lubrication Guide
- 45.5. General Compressor Maintenance
- 46. Auxiliary Air Dryer Assembly
- 47. Lockout Valves
- 48. Safety Warnings
- 49. Air Filtration
- 50. House Filter Fans
- 50.1. Lubrication
- 50.2. Dynavane Air Cleaner
- 51. Air Conditioner/Heater
- 51.1. Evaporator
- 51.2. Condenser
- 51.3. Pressurizer
- 51.4. Specifications
- 52. Engineering Data
- 53. Capscrew (Bolt) Grade
- 53.1. Bolt Tightening
- 54. Measurement Systems
- 54.1. Linear Measurements
- 54.2. Area Measurements
- 54.3. Volume Measurements
- 54.4. Torque Measurements
- 54.5. Weight Measurements – Conventional
- 55. Wire Locking Capscrews
- 56. Torque Nut Installation
- 57. Expansion Bolt Installation
- 57.1. Tightening Procedure for 1.25-Inch Torque Nut
- 57.2. Tightening Procedure for 1.5-Inch Torque Nut
- 57.3. Tightening Procedure for 2-Inch Torque Nut
- 57.4. Tightening Procedure for 2-Inch Torque Nut
- 57.5. Tightening Procedure for 3.5-Inch Torque Nut
- 57.6. Procedure For Use Of Mechanical Tensioner On 3.5 Inch Crawler Rods
- 57.7. Tightening Procedures – Expansion Bolts
- 58. Torque Nut Removal Procedure
- 58.1. Thread Lubrication
- 59. Torque Nut Helpful Hints
- 60. Locking Assemblies
- 60.1. Locking Assembly Removal
- 61. Pinion and Hub Installation
- 61.1. Removal from a Shaft
- 61.2. Mounting a Pinion or Hub on a Shaft
- 61.3. Pre-heat Advance Requirements – Pinions and Hubs
- 61.4. Motor Coupling Pre-Heat Advance Requirements
- 62. Open Gear Contact Check
- 63. Open Gear Break-In
- 64. Maintenance Welding
- 64.1. Welding Electrodes
- 64.2. Repair Welding of Cracks
- 64.3. Repair Welding of Broken Parts
- 64.4. Repair Welding Swing Rack Teeth
- 64.5. Welding and Cutting Equipment
- 64.6. Stress Relieving Temperature Measuring Equipment
- 65. Wire Rope Care and Maintenance
- 65.1. Storage
- 65.2. Checking Diameter
- 65.3. Handling Wire Rope
- 65.4. Seizing Wire Rope
- 65.5. End Preparations/Terminations
- 65.6. Wire Rope Clips
- 65.7. Inspection of Sheaves and Drums
- 65.8. Breaking In a New Wire Rope
- 65.9. Inspection Data
- 65.10. Guideline to Inspections and Reports
- 66. Seals
- 66.1. Seal Installation
- 66.2. Gearcase Sealing
- 67. Hydraulic Crowd Service Procedures
- 68. Hydraulic System Cleanliness
- 69. Hydraulic System Oil Contamination Guide
- 69.1. Crowd Machinery Overview
- 69.2. Hydraulic Crowd Cylinder Overview
- 69.3. Cylinder Control Manifold Overview
- 69.4. Auxiliary Power Unit Overview
- 69.5. Power Module/Lower Tank Overview
- 69.6. Lower Tank, Crowd Motor, Transmission Pumps Overview
- 69.7. Flushing/PDT Lube Motor Overview
- 69.8. Circulation Filter Overview
- 69.9. Manifolds Overview
- 69.10. Oil Circulation Manifold Overview
- 69.11. Pump Control Manifold Overview
- 69.12. Upper Hydraulic Tank Overview
- 70. Oil Circulation Pump Overview
- 70.1. Isolator Tank Overview
- 70.2. Oil Cooler Plumbing Overview
- 70.3. Accumulator Overview
- 71. Hydraulic Crowd Sensor Locations
- 71.1. Cylinder Sensors
- 71.2. Power Module Sensors
- 71.3. Upper Hydraulic Tank Sensors
- 71.4. Pump Control Manifold Sensor
- 71.5. Auxiliary Power Unit Sensor
- 71.6. Oil Cooler Sensors
- 72. Inspection
- 72.1. PDT Leak Inspection
- 72.2. Circulation Plumbing Inspection
- 72.3. Oil Circulation Pump Inspection
- 72.4. Isolator Troubleshooting
- 72.5. Isolator Tank Inspection
- 72.6. Isolator Manifold Inspection
- 72.7. Vacuum Breaker Inspection
- 72.8. Isolator Plumbing Inspection
- 72.9. Accumulator Inspection
- 72.10. Accumulator Pressure Test Charge
- 73. Service Procedures
- 73.1. HydraCrowd Cylinder Bleeding Process
- 73.2. Hydraulic Crowd Start-Up Procedure
- 73.3. Standard System Flushing Filtration
- 73.4. Complete System Flushing Filtration
- 73.5. Initial System Oil Fill
- 73.6. System Top Off
- 73.7. System Oil Drain – Partial
- 73.8. System Oil Drain – Complete
- 73.9. Auxiliary Power Unit Fill Filter Replacement
- 73.10. PDT – Initial Oil Fill
- 73.11. PDT – Oil Top Off
- 73.12. PDT – Oil Level Check
- 73.13. PDT – Oil Drain
- 74. Hydraulic Crowd Cooler Cleaning
- 75. Hydraulic Crowd Oil Cooler – Drain
- 76. Hydraulic Crowd Oil Cooler Replacement
- 76.1. Purging The Main Pumps
- 76.2. Hydraulic System Prefill Filter Replacement
- 76.3. Upper Tank Return Filter Cleaning
- 76.4. Upper Tank Return Filter Replacement
- 76.5. Isolator Removal And Replacement
- 76.6. Isolator Draining
- 76.7. Circulation Filter Replacement
- 76.8. Hydraulic Hose Replacement
- 76.9. Main Pump Pressure Hose Replacement
- 76.10. CECV Smart Module Replacement
- 76.11. CECVR/CECVH Valve Replacement
- 76.12. RECV Smart Module Replacement
- 76.13. RECV Valve Replacement
- 76.14. RV3 Module Replacement
- 76.15. RV3 RV4 Relief Valve Replacement
- 77. Hydraulic Crowd Service Schedule
- 78. Schematics
- 79. Side View
- 80. Deck Plan
- 81. OGL System A B Schematic
- 82. Grease System C Schematic
- 83. HVAC Schematic
- 84. Air Schematic
- 85. Hydraulic Crowd Troubleshooting Schematics










