Bucyrus 495HR2 Mining Shovel Service Manual BI624092
$30.00
- Type Of Manual: Service Manual
- Manual ID: BI624092
- Number of Pages: 556
- Size: 20.4MB
- Format: PDF
Product details
-
Model List:
- 495HR2 Mining Shovel
- 1. Table of Contents
- 2. Safety Symbols
- 3. Safety Precautions
- 3.1. General Precautions
- 3.2. Maintenance Precautions
- 3.3. Operating Precautions
- 3.4. Fire Prevention
- 3.5. Warning Signs And Decals
- 4. Introduction
- 5. About This Manual
- 5.1. Purpose
- 5.2. Organization
- 5.3. Terminology
- 5.4. Revisions
- 5.5. Precautions and Disclaimers
- 5.6. Contact
- 6. Swinging Restraint Ballast Box Support
- 6.1. Ballast Box Support
- 6.2. Swinging Restraint
- 7. Machine Overview
- 8. Lower Works
- 8.1. Crawlers
- 8.2. Truck Frame
- 8.3. Swing Rack
- 8.4. Roller Circle
- 8.5. Propel Machinery
- 8.6. Collector Rings
- 9. Rotating Deck
- 9.1. Revolving Frame
- 9.2. Center Pintle
- 9.3. Deck Extensions
- 9.4. Ballast Box
- 9.5. Machinery House
- 9.5.1. Boarding Stairs
- 9.5.2. Vertical Boarding Ladder
- 9.6. A-Frame
- 9.7. Hoist Machinery
- 9.8. Swing Machinery
- 9.9. Crowd Machinery
- 9.10. Operators Cab
- 9.11. Compressed Air System
- 9.12. Automatic Lubrication System
- 9.13. Lube Reservoir Fill / Overflow Plumbing
- 10. Front End Equipment
- 10.1. Suspension Strands
- 10.2. Boom
- 10.3. Running Ropes
- 10.4. Saddle Block
- 10.5. Dipper Handle
- 10.6. Dipper
- 10.7. Padlocks
- 10.8. Dipper Trip
- 11. Typical Machine Specifications
- 12. General Estimated Component Weights
- 12.1. Lower Works
- 12.2. Upper Works
- 12.3. Front End
- 13. Lubrication
- 14. Lubrication Principles
- 15. Greasing Main A.C. Drive Motors
- 15.1. Type of Grease
- 15.2. Initial Commissioning
- 15.3. Maintenance
- 15.4. Regreasing Intervals
- 16. Lubricant Selection
- 17. Oil Fill Capacities
- 17.1. Types Of Lubricants And Capacities
- 17.1.1. Quantities for First Fill of Lubricants
- 18. Lubricant Replacement/Sampling
- 18.1. Lubricant Change Cycle
- 19. Automatic Lubrication System
- 19.1. Lube Room
- 19.2. Lube Reservoir Fill / Overflow Plumbing
- 19.2.1. Auto Lube Control Panel
- 19.3. Lower Works Lubrication
- 19.4. Revolving Frame Lubrication
- 19.5. Hoist Rope Rollers Lubrication
- 19.6. Front End Lubrication
- 19.7. Lubricant Injectors
- 19.7.1. Lincoln Type SL-1 Lubricant Injectors
- 19.7.2. Lincoln Type SL-V Lubricant Injectors
- 19.7.3. Injector Advantages
- 20. Propel Machinery Lubrication
- 21. Hoist Machinery Lubrication
- 21.1. Hoist OGL Reservoir
- 21.2. Hoist Oil Cooler
- 21.3. Filter Element Cleaning
- 22. Swing Machinery Lubrication
- 23. Crowd Rope Take-up Mechanism Lubrication
- 24. Crowd Machinery Lubrication
- 25. Air Compressor Lubrication
- 25.1. ACSL – Air Compressor (Screw-Type) Lubricant
- 26. Lubrication Specifications
- 26.1. RWRL – Running Wire Rope Lubricant
- 26.2. EGL – Enclosed Gearcase Lubricant
- 26.3. MPG – Multipurpose Grease
- 26.4. OGL – Open Gear Lubricant
- 27. Preventive Maintenance
- 28. Introduction
- 28.1. Preventive Maintenance Program
- 28.2. Elements of an Effective Maintenance Program
- 28.3. Scheduled Preventive Maintenance Program
- 28.4. General Safety Considerations
- 29. Maintenance During Machine Operation
- 29.1. Maintenance Precautions
- 30. Preventive Maintenance for Lubrication
- 30.1. Lubricant Cleanliness
- 31. Frequency of Inspection and Maintenance
- 32. Maintenance Schedules
- 32.1. Maintenance Inspection Check Points
- 32.1.1. Daily
- 32.1.2. Every 100 Hours or Weekly
- 32.1.3. Every 500 Hours or Monthly
- 32.1.4. Every 1250 Hours or Quarterly
- 32.1.5. Every 2500 Hours or Semi-Annually
- 32.1.6. Every 5000 Hours or Annually
- 33. Major Component Locations
- 34. Service Procedures
- 35. Lower Works
- 35.1. Truck Frame Assembly
- 35.2. Swing Rack Assembly
- 35.2.1. Roller Circle Rail Replacement – Lower
- 35.2.2. Roller Circle Rail Replacement – Upper
- 35.3. Roller Circle Assembly
- 35.3.1. Roller Circle Adjustment
- 35.3.2. Adjustment Procedure
- 35.3.3. Run-in Procedure for the Roller Circle
- 35.3.4. Roller Circle Segment Removal
- 35.3.5. Roller Circle – Roller Replacement
- 35.4. Crawler Belts
- 35.4.1. Crawler Belt Maintenance
- 35.5. Crawler Side Frame Assembly
- 35.5.1. Crawler Side Frame Maintenance
- 35.5.2. Crawler Front Idler Roller Assembly
- 35.5.3. Load Rollers and Rear Idler Rollers
- 35.6. Propel Shaft Assembly
- 35.6.1. Installation Notes
- 35.6.2. Main Propel Drive Shaft Removal
- 35.6.3. Main Propel Shaft – Disassembly
- 35.6.4. Tumbler Rebuild Procedure
- 35.7. Propel Machinery
- 35.7.1. Propel Planetary Gearcase
- 35.7.2. Propel Motors
- 36. Rotating Deck
- 36.1. Revolving Frame
- 36.2. Center Pintle
- 36.2.1. Center Pintle Adjustment
- 36.2.2. Center Pintle Sleeve Removal
- 36.3. Collector Rings
- 36.3.1. Collector Ring Inspection
- 36.3.2. Collector Ring Repair
- 36.4. Cable Reel
- 36.4.1. Dos and Donts of Reel Operation
- 36.4.2. Cable Reel Operation
- 36.4.3. Hydraulic Drive Start Instructions
- 36.4.4. Unloading Valve Operating Instructions
- 36.4.5. Cable Reel Frame
- 36.4.6. Cable Reel Drum
- 36.4.7. Cable Reel Drive
- 36.4.8. Level Wind
- 36.4.9. Collector Ring
- 36.4.10. Cable Reel Maintenance
- 36.4.11. Lubrication
- 36.4.12. Hydraulic System
- 36.5. Swing Machinery
- 36.5.1. Swing Support Mounting Bolts
- 36.5.2. Swing Motor
- 36.5.3. Swing Planetary Gearcase
- 36.5.4. Swing Pinion Shafts
- 36.6. Hoist Machinery
- 36.6.1. Hoist Motor Removal
- 36.6.2. Motor Coupling Shaft
- 36.6.3. Hoist Gearcase Assembly
- 36.6.4. Hoist Drum Assembly
- 36.6.5. Hoist Gear Start-Up Inspections
- 36.6.6. Hoist Gear Replacement
- 36.7. Hoist Oil Cooler
- 36.7.1. Hoist Mounting Bolts
- 36.7.2. Hoist Limit Switch
- 36.8. Crowd Machinery
- 36.8.1. Crowd Gearcase Disassembly
- 36.8.2. Crowd Gearcase Assembly
- 36.8.3. Crowd Motor
- 36.8.4. Crowd Gear and Drum
- 36.9. Operators Cab Mounting
- 36.9.1. Operators Cab Isolator Mount Replacement
- 36.10. Operators Seat Replacement
- 36.11. Joystick Replacement
- 36.11.1. Joystick Calibration
- 36.12. Wiper Arm Replacement
- 36.12.1. Wiper Blade Replacement
- 36.12.2. Wiper Motor Replacement
- 37. Machinery House
- 37.1. Walkways, Stairways, and Handrails
- 37.1.1. Boarding Stairs
- 37.1.2. Vertical Boarding Ladder, left
- 38. Front End Equipment
- 38.1. Boom Assembly
- 38.1.1. Boom Repair
- 38.2. Boom Limit Switch Installation
- 38.3. Boom Point Sheaves
- 38.3.1. Boom Point Sheave Removal and Disassembly
- 38.3.2. Boom Point Sheave Reassembly and Installation
- 38.4. Boom Bumper
- 38.5. Saddle Block
- 38.5.1. Saddle Block Repair
- 38.5.2. Saddle Block Removal
- 38.6. Dipper Handle Assembly
- 38.6.1. Dipper Handle Removal
- 38.6.2. Crowd Rope Take-Up Mechanism
- 38.7. Dipper Assembly
- 38.7.1. Dipper Door
- 38.7.2. Dipper Door Bumpers
- 38.7.3. Dipper Door Snubbers
- 38.7.4. Dipper Pitch Brace
- 38.7.5. Dipper Padlock
- 38.8. Dipper Removal Installation
- 38.9. Dipper Trip Assembly
- 38.10. Crowd Rope Take-up Hydraulic Unit
- 38.11. A-Frame
- 38.12. Auxiliary Winch
- 38.13. Hoist Rope Support Roller
- 38.14. Boom Support Ropes
- 38.15. Wire Ropes
- 38.15.1. Wire Rope Inspection
- 38.16. Hoist Rope Reeving Replacement
- 38.17. Crowd Rope Reeving Replacement
- 38.18. Retract Rope Reeving Replacement
- 38.19. Crowd and Retract Rope Tightening
- 38.20. Dipper Trip Rope Reeving Replacement
- 38.21. Hoist and Crowd Limit Systems
- 38.21.1. Setting Limits In The Hoist Crowd System
- 39. Brakes and Couplings
- 40. Brakes
- 40.1. Disc Brake Operation
- 40.2. Maintenance
- 40.3. Brake Adjustment Specifications
- 40.4. Hoist Brake
- 40.4.1. Hoist Brake Adjustment
- 40.4.2. Hoist Brake Installation
- 40.4.3. Hoist Brake Wear Release Switches
- 40.5. Crowd Brake
- 40.5.1. Crowd Brake Installation
- 40.5.2. Crowd Brake Wear Release Switches
- 40.6. Propel Brake
- 40.6.1. Propel Brake Adjustment
- 40.6.2. Propel Brake Installation
- 40.6.3. Tachometer Mounting Alignment
- 40.7. Swing Brake
- 40.7.1. Swing Brake Installation
- 40.7.2. Swing Brake Wear Release Switches
- 40.7.3. Swing Brake Burnishing
- 40.8. Spring Replacement All Brakes
- 40.9. Friction Disc Replacement All Brakes
- 40.10. O-Ring Replacement All Brakes
- 40.11. Brake Wear Release Switches Single Disc Brakes
- 40.12. Brake Wear Release Switches Multiple Disc Brakes
- 41. Couplings
- 41.1. Grid Couplings
- 41.1.1. Lubrication
- 41.1.2. Coupling Disassembly and Grid Removal
- 41.1.3. Grid Coupling Installation
- 41.1.4. Seal Replacement without Hub Removal
- 41.1.5. Grid Coupling Alignment
- 41.2. Gear Couplings
- 41.2.1. Coupling Installation
- 41.2.2. Gear Coupling Alignment
- 41.2.3. Hoist Coupling Shaft Alignment
- 42. Compressed Air System
- 43. Air Compressor
- 44. Lockout Valves
- 45. Safety Warnings
- 46. Air Filtration
- 47. House Filter Fans
- 47.1. Lubrication
- 47.2. Dynavane Air Cleaner
- 48. Air Conditioner/Heater
- 48.1. Evaporator
- 48.2. Condenser
- 48.3. Pressurizer
- 48.3.1. Cleaning The Washable Filter
- 48.4. Specifications
- 49. Engineering Data
- 50. Capscrew (Bolt) Grade
- 50.1. Bolt Tightening
- 50.1.1. Torque Wrench Method
- 50.1.2. Turn-of-Nut Method
- 51. Measurement Systems
- 51.1. Linear Measurements
- 51.2. Area Measurements
- 51.3. Volume Measurements
- 51.4. Torque Measurements
- 51.5. Weight Measurements – Conventional
- 52. Split Flange Assembly Procedure
- 53. Wire Locking Capscrews
- 54. Torque Nut Installation
- 55. Expansion Bolt Installation
- 55.1. Tightening Procedure for 1.25-Inch Torque Nut
- 55.2. Tightening Procedure for 2-Inch Torque Nut
- 55.3. Tightening Procedure for 2-Inch Torque Nut
- 55.4. Tightening Procedure for 2-Inch Torque Nut
- 55.5. Tightening Procedure for 2.5-Inch Torque Nut
- 55.6. Tightening Procedure for 3-Inch Torque Nut
- 55.7. Tightening Procedure for 3.5-Inch Torque Nut
- 55.8. Procedure For Use Of Mechanical Tensioner On 3.5 Inch Crawler Rods
- 55.8.1. Initial Tensioning
- 55.8.2. Final Tensioning
- 55.9. Tightening Procedures – Expansion Bolts
- 55.9.1. Rack Roller Torque Rod, Tapered Sleeve 1.0 Inch Torque Nut
- 55.9.2. Hoist Torque Rod, Tapered Sleeve 1.62 Inch Torque Nut
- 55.9.3. Swing Torque Rod Tapered Sleeve 3.25 Inch Torque Nut
- 56. Torque Nut Removal Procedure
- 56.1. Thread Lubrication
- 57. Torque Nut Helpful Hints
- 58. Locking Assemblies
- 58.1. Locking Assembly Removal
- 59. Pinion and Hub Installation
- 59.1. Removal from a Shaft
- 59.2. Mounting a Pinion or Hub on a Shaft
- 59.3. Pre-heat Advance Requirements – Pinions and Hubs
- 59.4. Motor Coupling Pre-Heat Advance Requirements
- 60. Open Gear Contact Check
- 61. Open Gear Break-In
- 62. Maintenance Welding
- 62.1. Welding Electrodes
- 62.2. Repair Welding of Cracks
- 62.2.1. Preheat
- 62.2.2. Welding Technique
- 62.3. Repair Welding of Broken Parts
- 62.4. Repair Welding Swing Rack Teeth
- 62.4.1. Preparation
- 62.4.2. Swing Rack Welding Electrodes
- 62.4.3. Preheat
- 62.4.4. Welding Procedure
- 62.5. Welding and Cutting Equipment
- 62.6. Stress Relieving Temperature Measuring Equipment
- 63. Wire Rope Care and Maintenance
- 63.1. Storage
- 63.2. Checking Diameter
- 63.3. Handling Wire Rope
- 63.4. Seizing Wire Rope
- 63.5. End Preparations/Terminations
- 63.6. Wire Rope Clips
- 63.6.1. Wire Rope Clip Application
- 63.6.2. Wedge Sockets
- 63.7. Inspection of Sheaves and Drums
- 63.8. Breaking In a New Wire Rope
- 63.9. Inspection Data
- 63.10. Guideline to Inspections and Reports
- 63.10.1. Wire Rope Inspection Criteria
- 64. Seals
- 64.1. Seal Installation
- 64.2. Gearcase Sealing
- 65. Schematics
- 66. Schematics
- 67. Side View
- 68. Deck Plan
- 69. OGL System A B Schematic
- 70. Grease System C Schematic
- 71. HVAC Schematic
- 72. Air Schematic










