Bucyrus 7MFBH-56DD Feeder Breaker Operation And Maintenance Manual A6474X353
$30.00
- Type Of Manual: Operation And Maintenance Manual
- Manual ID: A6474X353
- Number of Pages: 238
- Size: 17.4MB
- Format: PDF
Product details
-
Model List:
- 7MFBH-56DD Feeder Breaker
- 1. 1. About this manual
- 2. About this manual…………………………………………………………. 1.3
- 3. Before starting to work ………………………………………………… 1.3
- 4. Who is this operating manual intended for?……………………. 1.3
- 5. What is the purpose of this operating manual?……………….. 1.4
- 6. Characters and symbols ……………………………………………… 1.5
- 7. 2. Your safety
- 8. Your safety……………………………………………………………………. 2.3
- 9. Personnel ………………………………………………………………….. 2.4
- 10. Operation………………………………………………………………. 2.4
- 11. Installation and repair……………………………………………… 2.4
- 12. Operating conditions …………………………………………………… 2.5
- 13. Intended use………………………………………………………….. 2.5
- 14. Unauthorized use …………………………………………………… 2.5
- 15. Safety instructions………………………………………………………. 2.7
- 16. General rules:………………………………………………………… 2.7
- 17. Storage and transport……………………………………………… 2.9
- 18. Installation and start-up…………………………………………… 2.9
- 19. Operation…………………………………………………………….. 2.10
- 20. Maintenance and repair…………………………………………. 2.10
- 21. 3. Storage and transport
- 22. Storage and transport……………………………………………………. 3.3
- 23. Storage……………………………………………………………………… 3.3
- 24. Storage of the machine and spare parts ……………………. 3.3
- 25. Transport…………………………………………………………………… 3.4
- 26. Before transport……………………………………………………… 3.6
- 27. 4. Installation
- 28. Installation ……………………………………………………………………. 4.3
- 29. Points to observe prior to installation …………………………….. 4.3
- 30. Who is allowed to carry out installation? ……………………. 4.3
- 31. Which tools are required for installation? …………………… 4.3
- 32. Notes on installation……………………………………………….. 4.4
- 33. Pre-installation check list…………………………………………. 4.5
- 34. Safety features ………………………………………………………. 4.6
- 35. Towing the feeder breaker …………………………………………… 4.9
- 36. 5. Operation
- 37. Operation……………………………………………………………………….5.3
- 38. How to operate the feeder breaker ………………………………..5.3
- 39. Who is allowed to operate the feeder breaker …………….5.3
- 40. When can conveying be started? ………………………………5.3
- 41. Controls and indicators…………………………………………………5.4
- 42. Primary operator’s station…………………………………………5.4
- 43. Secondary operator’s station………………………………….. 5.10
- 44. Remote tram control ……………………………………………… 5.21
- 45. Conveyor “AUTO” start procedure ………………………………. 5.24
- 46. Conveyor “MANUAL” start procedure ………………………….. 5.25
- 47. Shutdown procedure …………………………………………………. 5.26
- 48. Start and tram with hydraulic levers …………………………….. 5.27
- 49. Start and tram with tram remote………………………………….. 5.27
- 50. Conveyor operation …………………………………………………… 5.28
- 51. Control system operating parameters ………………………….. 5.30
- 52. Electrical system……………………………………………………….. 5.33
- 53. Shuttle car distribution box……………………………………. 5.33
- 54. Starter enclosure…………………………………………………. 5.36
- 55. Hydraulic system ………………………………………………………. 5.37
- 56. Mechanical assemblies ……………………………………………… 5.51
- 57. Crawler assembly (s) ……………………………………………. 5.51
- 58. Conveyor chain ……………………………………………………. 5.52
- 59. Grease take-up ……………………………………………………. 5.53
- 60. Head shaft ………………………………………………………….. 5.54
- 61. Conveyor power unit …………………………………………….. 5.55
- 62. Tail shaft …………………………………………………………….. 5.56
- 63. Breaker and breaker power unit assembly……………….. 5.57
- 64. Breaker assembly………………………………………….. 5.58
- 65. Breaker power unit assembly ………………………….. 5.59
- 66. Instructions on the maintenance …………………………………. 5.61
- 67. Important notes ……………………………………………………. 5.61
- 68. Before maintenance …………………………………………….. 5.61
- 69. Lubrication and inspection …………………………………….. 5.63
- 70. Specific lubrication and maintenance procedures …………. 5.67
- 71. Every 8 hours of operation ……………………………………. 5.67
- 72. Weekly ……………………………………………………………….. 5.72
- 73. Monthly ………………………………………………………………. 5.76
- 74. Every 3 months ……………………………………………………. 5.79
- 75. Every 1000 hours …………………………………………………. 5.80
- 76. Every 6 months ……………………………………………………. 5.82
- 77. Inspection of the feeder …………………………………………….. 5.85
- 78. Inspection of wear parts …………………………………………….. 5.86
- 79. Inspection of the fire suppression system …………………….. 5.87
- 80. Recharge of the fire suppression system……………………… 5.89
- 81. Instructions on the adjustment procedures ………………….. 5.91
- 82. Conveyor chain adjustment …………………………………… 5.91
- 83. Crawler track adjustment ………………………………………. 5.93
- 84. Under speed sensor calibration………………………………. 5.95
- 85. Hydrostatic pump relief valve adjustment…………………. 5.97
- 86. Hydrostatic pump charge pressure adjustment…………. 5.99
- 87. Pressure limiter…………………………………………………….5.100
- 88. Instructions on the replacement of wear parts …………….. 5.101
- 89. Head shaft …………………………………………………………. 5.101
- 90. Head shaft sprockets ………………………………………….. 5.105
- 91. Tail shaft …………………………………………………………… 5.108
- 92. Conveyor chain ………………………………………………….. 5.114
- 93. Crawler track ……………………………………………………… 5.117
- 94. Crawler assembly ………………………………………………. 5.120
- 95. Breaker shaft and breaker power unit ……………………. 5.129
- 96. Breaker power unit only………………………………… 5.135
- 97. Breaker shaft only………………………………………… 5.138
- 98. Conveyor power unit……………………………………………. 5.144
- 99. Breaker bit removal……………………………………………… 5.152
- 100. Tilt cylinder…………………………………………………………. 5.153
- 101. Lift cylinder…………………………………………………………. 5.155
- 102. 6. Technical data
- 103. Technical data………………………………………………………………..6.3
- 104. Components of the feeder breaker…………………………………6.3
- 105. Tightening torques ……………………………………………………….6.7
- 106. Permissible data ………………………………………………………….6.9
- 107. Lubrication fluids and greases …………………………………..6.9
- 108. 7. For your information
- 109. For your information ………………………………………………………7.3
- 110. Our service………………………………………………………………….7.3
- 111. Service address ………………………………………………………7.3
- 112. Rebuild facility address…………………………………………….7.4










