Bucyrus Ashton Installation Technical Manual BI618956

$30.00

  • Type Of Manual: Technical Manual
  • Manual ID: BI618956
  • Number of Pages: 81
  • Size: 3.0MB
  • Format: PDF

Product details

  • Model List:

    • Ashton Installation
  • 1. M00693.pdf
  • 1.1. General Safety
  • 1.1.1. Personnel
  • 1.1.1.1. Operation
  • 1.1.1.2. Installation and repair
  • 1.1.2. Operating conditions
  • 1.1.2.1. Intended use
  • 1.1.2.2. Unauthorised use
  • 1.1.3. Safety instructions
  • 1.1.3.1. General rules
  • 1.1.3.2. Noise emissions
  • 1.1.3.3. Condition
  • 1.1.3.4. Safety equipment
  • 1.1.3.5. Information signs
  • 1.1.3.6. Emergency-stop
  • 1.1.3.7. Block working area
  • 1.1.3.8. Moving parts
  • 1.1.4. Storage and Transport
  • 1.1.4.1. Transport safety device
  • 1.1.4.2. Lifting Equipment
  • 1.1.4.3. Floor conveying device
  • 1.1.5. Erection and commissioning
  • 1.1.5.1. Inclined storage
  • 1.1.5.2. Environmental acceptability
  • 1.1.6. Operation
  • 1.1.6.1. Moving conveyor
  • 1.1.7. Maintenance and repair
  • 1.1.7.1. Original parts
  • 1.1.7.2. Release of walking legs
  • 1.1.7.3. Lifting the conveyor
  • 1.1.7.4. Safety equipment
  • 1.1.8. Hydraulics
  • 1.1.8.1. Handling of Hydraulic Fluids
  • 1.1.8.2. Maintenance and Repair
  • 1.1.8.3. Permissible Hoses
  • 1.1.8.4. Installation of Hydraulic Hoses
  • 1.1.8.5. Hosing colours
  • 1.2. Storage and transport
  • 1.2.1. Storage
  • 1.2.1.1. Corrosion protection
  • 1.2.1.2. No direct exposure to sunlight
  • 1.2.1.3. Dirt and moisture
  • 1.2.1.4. Short-term storage
  • 1.2.1.5. Long-term storage
  • 1.2.1.6. Plastic deformation
  • 1.2.1.7. Random sample inspection
  • 1.2.1.8. Natural ageing
  • 1.2.1.9. HFA fluids
  • 1.2.2. Transport
  • 1.2.2.1. Load units dimensions and weights
  • 1.3. Introduction
  • 1.4. Shields
  • 1.4.1. Transport Units
  • 1.4.2. Points of Attachment
  • 1.4.3. Temperatures Below Freezing
  • 1.4.4. Electrical and Electronic Components
  • 1.4.5. Transport Safety Devices and Transport Units
  • 1.5. Monorail Installation
  • 1.5.1. Engineering and Planning
  • 1.5.2. Monorail Installation Platform Advance
  • 1.5.3. Roof Hanger Brackets (Monkey Face Hangers)
  • 1.5.4. Transport units
  • 1.5.4.1. Unloading the transport unit
  • 1.5.5. Installing Rails
  • 1.5.6. Curved Rail Installation
  • 1.5.6.1. Adaptor Rail
  • 1.5.6.1.1. Curved Rail
  • 1.5.7. Trolley Installation
  • 1.5.8. Cable and Hose Installation
  • 1.5.9. Negotiating curved monorail sections Inbye Rigid Sections
  • 1.5.10. Cable Installation
  • 1.5.11. Installing the Push Arm
  • 1.5.12. System Check Lists
  • 1.5.13. Monorail Monitoring
  • 1.5.14. Power Centre Move
  • 1.6. AFC PF6/1142 Pan Line
  • 1.6.1. Transport of the components
  • 1.6.2. Line Pans
  • 1.6.3. AFC Chain Assembly
  • 1.6.3.1. AFC Chain Connectors
  • 1.6.4. Dogbone Installation
  • 1.6.5. Inspection Doors Removal Procedure
  • 1.6.6. AFC Flights
  • 1.6.7. Correct Orientation of Chain
  • 1.6.8. AFC Chain Ramp (optional)
  • 1.6.9. Chain Puller Attachment (optional)
  • 1.6.10. Jumbotrack Shearer Haulage
  • 1.6.11. Importance of Alignment and Butting of Pans during Installat
  • 1.6.12. Threading the Bottom Race
  • 1.6.13. Cleaning the Bottom Race
  • 1.6.14. Pan Weight
  • 1.6.15. Wollbrecht AFC Chain Brace
  • 1.7. Beam Stage Loader (BSL)
  • 1.7.1. Prior to Assembly
  • 1.7.1.1. Who is allowed to carry out assembly work
  • 1.7.1.2. Assembly notes
  • 1.7.1.3. Clamping bolt connection in the overlapping area
  • 1.8. Crusher
  • 1.8.1. Assembly of the Drive Unit
  • 1.8.2. Instructions for Installation of the Gearbox
  • 1.8.3. Drive connection assembly
  • 1.8.4. Installation of the Crusher into the Stageloader
  • 1.9. Bootend
  • 1.9.1. Tramming the Crawler
  • 1.9.2. Towing and Free Wheeling
Rate this product