Bucyrus DBT Ashton Monorail Technical Manual BI618954
$30.00
- Type Of Manual: Technical Manual
- Manual ID: BI618954
- Number of Pages: 77
- Size: 3.1MB
- Format: PDF
Product details
-
Model List:
- DBT Ashton Monorail
- 1. M00691.pdf
- 1.1. General Safety
- 1.2. Isolation Procedures
- 1.2.1. Outbye and Monorail
- 1.2.2. Shields
- 1.2.2.1. Hydraulic Bleed Points
- 1.2.2.2. Operation Screw Type
- 1.2.2.3. Operation Manometer Gauge Port Type
- 1.2.3. AFC and BSL
- 1.2.4. Bootend
- 1.2.5. Residual Risk
- 1.2.5.1. Supplementary Regulations
- 1.2.6. Personnel
- 1.2.6.1. Operation and maintenance
- 1.2.6.2. Qualification
- 1.2.7. Use in conformance with specifications
- 1.2.8. Use contrary to specifications
- 1.2.9. Safety instructions
- 1.2.9.1. Basic principles
- 1.2.9.2. Lighting
- 1.2.9.3. Signalling Systems and Protective Devices
- 1.2.9.4. Emergency Stop
- 1.2.9.5. Support Lock-out Switch
- 1.2.9.6. Moving Parts
- 1.2.10. Storage and transport
- 1.2.11. Hydraulics
- 1.2.11.1. Handling of Hydraulic Fluids
- 1.2.11.2. Maintenance and Repair
- 1.2.11.3. Permissible Hoses
- 1.2.11.4. Installation of Hydraulic Hoses
- 1.2.12. Hosing colours
- 1.3. Storage and transport
- 1.3.1. Storage
- 1.3.1.1. Storing the equipment
- 1.3.2. Transport
- 1.3.2.1. Before transport
- 1.3.2.2. Transport of the components
- 1.4. Assembly
- 1.4.1. Prior to Assembly
- 1.4.1.1. Who is allowed to carry out assembly work
- 1.4.1.2. Assembly notes
- 1.5. Introduction
- 1.6. Major Components of Monorail
- 1.6.1. Curved Rail Section
- 1.6.2. Inbye Rigid Section (Push Arm)
- 1.6.3. Outbye Manifold (Outbye Filter Station)
- 1.6.4. Inbye Manifold (Inbye Filter Station)
- 1.6.5. Bumper Trolley
- 1.6.6. Cable Connector Station
- 1.6.7. Rail Storage Unit
- 1.6.8. Monorail Transport Units
- 1.6.9. Installation Platform
- 1.7. Installation
- 1.7.1. Engineering and Planning
- 1.7.2. Monorail Installation Platform Advance
- 1.7.3. Roof Hanger Brackets (Monkey Face Hangers)
- 1.7.4. Transport units
- 1.7.4.1. Unloading the transport unit
- 1.7.5. Installing Rails
- 1.7.6. Removing Rails
- 1.7.7. Curved Rail Installation
- 1.7.7.1. Adaptor Rail
- 1.7.7.1.1. Curved Rail
- 1.7.8. Trolley Installation
- 1.7.9. Cable and Hose Installation
- 1.7.10. Negotiating curved monorail sections Inbye Rigid Sections
- 1.7.11. Changing Hoses
- 1.7.11.1. Inbye Manifold
- 1.7.11.2. Outbye Manifold
- 1.7.12. Cable Installation
- 1.7.13. Installing the Push Arm
- 1.7.14. System Check Lists
- 1.7.15. Monorail Monitoring
- 1.7.16. Power Centre Move
- 1.8. System Operation
- 1.8.1. Monorail Sequence
- 1.9. Shunting Trolley
- 1.9.1. Technical Specification
- 1.9.2. Operation
- 1.9.2.1. Enrailment of shunting trolley on the rail system
- 1.9.2.2. Brake release
- 1.9.2.3. Brake operation
- 1.9.2.4. Pretensioning of drive wheels
- 1.9.3. Shunting Trolley Installation Platform
- 1.10. Monorail Maintenance
- 1.10.1. Daily Maintenance
- 1.10.1.1. Rails and roof bolts
- 1.10.1.2. Trolley body and brake levers including bolts
- 1.10.1.3. Running and drive wheels
- 1.10.1.4. Couplings and drawbars of attached vehicles and trolleys
- 1.10.1.5. Brake shoes
- 1.10.1.6. Compressed air motor
- 1.10.1.7. Brake release cylinder
- 1.10.1.8. Check Operation of Brake
- 1.10.2. Monthly Maintenance
- 1.11. Shunting Trolley Maintenance
- 1.11.1. Check daily
- 1.11.1.1. Trolley body and brake levers including bolts
- 1.11.1.2. Running and drive wheels
- 1.11.2. Couplings and drawbars of attached vehicles and trolleys
- 1.11.2.1. Brake shoes
- 1.11.3. Pneumatic system
- 1.11.3.1. Compressed air motor
- 1.11.3.2. Brake release cylinder
- 1.11.3.3. Check Operation of Brake
- 1.11.4. Check weekly
- 1.11.5. Check monthly
- 1.11.6. Performance graph of shunting trolley 9 kW
- 1.11.7. Lubrication Scheme for Shunting Trolley 9k
- 1.11.7.1. Weekly Maintenance










