Bucyrus Equipment Crawler Units (Size 9) Technical Manual BI616744

$30.00

  • Type Of Manual: Technical Manual
  • Manual ID: BI616744
  • Number of Pages: 50
  • Size: 2.1MB
  • Format: PDF

Product details

  • Model List:

    • Equipment Crawler Units (Size 9)
  • 1. M00637.pdf
  • 1.1. General Safety
  • 1.1.1. PERSONNEL
  • 1.1.1.1. Operation
  • 1.1.1.2. Installation and repair
  • 1.1.2. OPERATING CONDITIONS
  • 1.1.2.1. Intended use
  • 1.1.2.2. Unauthorised use
  • 1.1.3. SAFETY INSTRUCTIONS
  • 1.1.3.1. General rules
  • 1.1.3.2. Noise emissions
  • 1.1.3.3. Condition
  • 1.1.3.4. Safety equipment
  • 1.1.3.5. Information signs
  • 1.1.3.6. Emergency stops
  • 1.1.3.7. Block working area
  • 1.1.3.8. Moving parts
  • 1.1.4. STORAGE AND TRANSPORT
  • 1.1.4.1. Transport safety device
  • 1.1.4.2. Lifting Equipment
  • 1.1.4.3. Floor conveying device
  • 1.1.5. ERECTION AND COMMISSIONING
  • 1.1.5.1. Environmental acceptability
  • 1.1.6. OPERATION
  • 1.1.7. MAINTENANCE AND REPAIR
  • 1.1.7.1. Original parts
  • 1.1.7.2. Safety equipment
  • 1.1.8. HYDRAULICS
  • 1.1.8.1. Handling of Hydraulic Fluids
  • 1.1.8.2. Maintenance and Repair
  • 1.1.8.3. Permissible Hoses
  • 1.1.8.4. Installation of Hydraulic Hoses
  • 1.2. Storage and transport
  • 1.2.1. STORAGE
  • 1.2.1.1. Corrosion protection
  • 1.2.2. STORAGE OF THE EQUIPMENT
  • 1.2.2.1. No direct exposure to sunlight
  • 1.2.2.2. Dirt and moisture
  • 1.2.2.3. Short-term storage
  • 1.2.2.4. Long-term storage
  • 1.2.2.5. Plastic deformation
  • 1.2.2.6. Random sample inspection
  • 1.2.2.7. Natural ageing
  • 1.2.2.8. HFA fluids
  • 1.2.3. TRANSPORT
  • 1.2.3.1. Load units dimensions and weights
  • 1.2.4. BEFORE TRANSPORT
  • 1.2.4.1. Temperatures below freezing
  • 1.2.4.2. Electrical and electronic components
  • 1.2.5. TRANSPORT OF THE COMPONENTS
  • 1.2.5.1. Machine parts
  • 1.3. Pump and Transformer Station Crawler Units
  • 1.3.1. DESCRIPTION
  • 1.4. Towing Crawler Units
  • 1.4.1. CONNECT TOWING UNIT TO DRAW BAR
  • 1.4.2. DISENGAGE TRACKS
  • 1.5. Hooking Up and Driving Track Units
  • 1.5.1. TRANSFORMER STATION CONNECTION AND OPERATION
  • 1.5.2. PUMP STATION CONNECTION AND OPERATION
  • 1.6. Disconnecting the crawler unit
  • 1.7. Track Maintenance
  • 1.7.1. TENSIONING TRACKS
  • 1.7.1.1. General
  • 1.7.1.2. Procedure
  • 1.7.2. REPLACEMENT OF TRACK TENSIONING CYLINDER
  • 1.7.2.1. General
  • 1.7.2.2. Procedure
  • 1.7.3. REPLACEMENT OF TRACK FROM TRACK FRAME
  • 1.7.3.1. General
  • 1.7.3.2. Procedure
  • 1.7.4. TRACK ASSEMBLY REMOVAL COMPLETE
  • 1.7.4.1. General
  • 1.7.4.2. Procedure – Removal
  • 1.7.4.3. Procedure – Refitting
  • 1.8. Oil Filling of Planetary Hubs
Rate this product