Bucyrus SCH5000 Hydra-Trac Self Contained Hydraulic Track Drill Technical Manual BI620166
$30.00
- Type Of Manual: Technical Manual
- Manual ID: BI620166
- Number of Pages: 767
- Size: 38.2MB
- Format: PDF
Product details
-
Model List:
- SCH5000 Hydra-Trac Self Contained Hydraulic Track Drill
- 1. SCH5000Service.pdf
- 1.1. Introduction
- 1.1.1. Table of Contents
- 1.1.2. /Metric Conversions
- 1.1.3. Glossary of Terms
- 1.1.4. Component Locations (C-10 engine)
- 1.1.5. Component Locations (3306 engine)
- 1.2. Section 1
- 1.2.1. Overview of Potential Hazards
- 1.2.2. Safety Instructions
- 1.2.3. Clearances from High Voltage Lines
- 1.3. Section 2
- 1.4. MAIN FRAME/TRACKS (INTERTRACTOR CRAWLERS)
- 1.4.1. Track Oscillation Cylinders
- 1.4.1.1. Removal
- 1.4.1.2. Installation
- 1.4.2. Track Maintenance
- 1.4.3. Track Tension Adjustment
- 1.4.4. Metric Bolt Torque Specifications
- 1.4.5. Track Assembly
- 1.4.5.1. Separate Track Chain Assembly
- 1.4.5.2. Track Link – Repair Replace
- 1.4.5.3. Track Shoe (grouser) – Mounting to Track Chain
- 1.4.5.4. Grouser Bolt Torque (Direct Torque Method)
- 1.4.5.5. Grouser Bolt Torque (Torque Turn Method)
- 1.4.5.6. Track Chain Shoe – Assembly Installation
- 1.4.6. Final Drive – General Description
- 1.4.6.1. Removal from Track Frame
- 1.4.6.2. Installation into Track Frame
- 1.4.6.3. Final Drive Maintenance
- 1.4.6.4. Final Drive Assembly
- 1.4.7. Idler Unit
- 1.4.7.1. General Description
- 1.4.7.2. Removal and Disassembly
- 1.4.7.3. Assembly and Installation
- 1.4.8. Track Rollers
- 1.4.8.1. General Description
- 1.4.8.2. Removal Disassembly
- 1.4.8.3. Track Roller – Assembly
- 1.4.8.4. Track Roller – Test and Install
- 1.4.9. Support Rollers
- 1.4.9.1. General Description
- 1.4.9.2. Removal Disassembly
- 1.5. Reedrill Crawlers (early machines)
- 1.5.1. Track Oscillation Cylinders
- 1.5.1.1. Removal
- 1.5.1.2. Installation
- 1.5.2. Track Tension Adjustment
- 1.5.3. Track Assembly
- 1.5.3.1. Separate Track Chain Assembly
- 1.5.3.2. Connect Track Assemblies
- 1.5.4. Front Idler Recoil Spring
- 1.5.4.1. Removal
- 1.5.4.2. Replace
- 1.5.4.3. Front Idler Disassembly
- 1.5.4.4. Front Idler Assembly
- 1.5.5. Track Carrier Rollers
- 1.5.5.1. Removal
- 1.5.5.2. Replace
- 1.5.5.3. Duo-Cone Seals
- 1.5.6. Final Drive Oil
- 1.5.6.1. Checking Oil Level in Final Drive
- 1.5.6.2. Changing Oil in Final Drive
- 1.5.6.3. Towing Procedure (late models)
- 1.5.6.4. Gear Drive Disconnect (machines with spacer)
- 1.5.6.5. Gear Drive Disconnect (early model machines with spring)
- 1.5.6.6. Final Drive Disengage Spacer Retrofit
- 1.5.6.7. Final Drive Assembly
- 1.6. Section 3
- 1.7. POWER TRAIN
- 1.7.1. Hydraulic Pumps
- 1.7.1.1. Removal and Installation
- 1.7.2. Pump Drive
- 1.7.2.1. Funk Pump Drive – Removal (for machines built after May, 1998)
- 1.7.2.2. Funk Pump Drive Gearbox – Repair
- 1.7.2.3. Terrell Pump Drive Gearbox – Repair
- 1.7.3. Hydraulic Pump Retrofit Procedure
- 1.7.3.1. Rexroth Pump Installation
- 1.7.4. Fuel System – Cat 3306 Engine
- 1.7.4.1. Fuel Tank Maintenance
- 1.7.4.2. Fuel Filters – Every 250 Hours of Operation
- 1.7.4.3. Priming the Fuel System
- 1.7.5. Fuel System – Cat C-10 Engine
- 1.7.5.1. Fuel Tank Maintenance
- 1.7.5.2. Fuel Filters – Every 250 Hours of Operation
- 1.7.5.3. Priming the Fuel System
- 1.7.6. Coolers – 3306 Engine
- 1.7.6.1. Engine Radiator – Capacity and Service
- 1.7.6.2. Coolant Specifications
- 1.7.6.3. Coolers – Removal and Installation
- 1.7.7. Coolers – C-10 Engine
- 1.7.7.1. Engine Radiator – Capacity and Service
- 1.7.7.2. Coolant Specifications
- 1.7.7.3. Coolers – Removal and Installation
- 1.8. Section 4
- 1.9. HYDRAULIC/ELECTRICAL SYSTEMS/CAB COMPONENTS
- 1.9.1. Hydraulic System
- 1.9.2. Basic Hydraulic Schematic (Vickers Pump)
- 1.9.3. Basic Hydraulic Schematic (Rexroth Pumps)
- 1.9.4. Tram Console with Boom Hosing
- 1.9.5. Hydraulic Schematic – Drill Console
- 1.9.6. Hydraulic Schematic – Cab
- 1.9.7. Rod Changer Piping
- 1.9.8. Boom Piping
- 1.9.9. Hydraulic Valves – Maintenance
- 1.9.9.1. Boom/Feed Pilot Valve
- 1.9.9.2. Tram Pilot Valve
- 1.9.10. Electrical Arrangement – 3306 Engine
- 1.9.11. Schematic – Non-Cab (3306 Engine)
- 1.9.12. Schematic – with Cab (3306 Engine)
- 1.9.13. Wiring Diagram – with Cab (3306 Engine)
- 1.9.14. Wire Number/Color Code Chart (3306 Engine)
- 1.9.15. Wiring Diagram – Boom Control Panel
- 1.9.16. Wiring Diagram – Drill Control Panel
- 1.9.17. Wiring Diagram – Tram Control Panel
- 1.9.18. Wiring Diagram – Instrument Panel (3306 Engine)
- 1.9.19. Air Ride Seat Assembly
- 1.9.20. Electrical Arrangement – C-10 Engine
- 1.9.21. Schematic with Cab (C-10 Engine)
- 1.9.22. Wiring Diagram – Instrument Panel (C-10 Engine)
- 1.9.23. Wiring Diagram with Cab (C-10 Engine)
- 1.10. Section 5
- 1.11. AIR SYSTEM
- 1.11.1. Air Receiver Tank
- 1.11.1.1. Preventive Maintenance
- 1.11.1.2. Troubleshooting
- 1.11.2. Air System Components
- 1.11.3. Compressor Oil Piping
- 1.11.3.1. Thermostatic Bypass Valve
- 1.11.4. Air Valve Piping (cab machines)
- 1.11.5. Air Valve Piping (non-cab machines)
- 1.11.6. Compressor Assembly
- 1.11.6.1. Compressor Unit
- 1.11.6.2. Drive Coupling – Replacement
- 1.11.6.3. Air Compressor Drive Motor
- 1.11.7. Detergent Tank Piping
- 1.12. Section 6
- 1.13. Boom Feed Components
- 1.13.1. Boom Lift Cylinder
- 1.13.1.1. Removal
- 1.13.1.2. Replace
- 1.13.1.3. Cylinder Bleeding Procedure and Final Installation
- 1.13.2. Boom Swing Cylinder
- 1.13.2.1. Removal
- 1.13.2.2. Replace
- 1.13.2.3. Cylinder Bleeding Procedure and Final Installation
- 1.13.3. Feed Dump Cylinder
- 1.13.3.1. Removal
- 1.13.3.2. Replace
- 1.13.3.3. Cylinder Bleeding Procedure and Final Installation
- 1.13.4. Feed Swing Cylinder
- 1.13.4.1. Removal
- 1.13.4.2. Replace
- 1.13.4.3. Cylinder Bleeding Procedure and Final Installation
- 1.13.4.4. Indexing the Feed Swing Cylinder
- 1.13.5. Feed Extension Cylinder
- 1.13.5.1. Removal
- 1.13.5.2. Replace
- 1.13.5.3. Cylinder Bleeding Procedure and Final Installation
- 1.13.6. Boom Shim/Wear Pad Replacement
- 1.13.6.1. Boom Wear Pads – Inspection
- 1.13.6.2. Feed and Feed Table – Removal from Boom
- 1.13.6.3. Inner Boom Tube – Removal
- 1.13.6.4. Rear Wear Pads and Shims – Installation
- 1.13.6.5. Front Wear Pads and Shims – Installation
- 1.13.6.6. Feed and Feed Table – Installation on Boom
- 1.13.6.7. Boom Wear Pads – Final Inspection
- 1.13.7. HPR2 Hydraulic Rock Drill
- 1.13.7.1. Removal from Feed
- 1.13.7.2. Mounting Slide Adjustment
- 1.13.8. Feed Chain Adjustment
- 1.13.9. Traveling Hose Reel Timing
- 1.13.10. Feed Table Wear Pad Adjustment
- 1.13.11. Feed Table Pivot Pin
- 1.13.11.1. Adjustment and Maintenance
- 1.14. Section 7
- 1.15. PRESSURE SETTINGS ADJUSTMENTS
- 1.15.1. Engine Adjustments – Caterpillar 3306
- 1.15.2. Engine Adjustments – Cat C-10
- 1.15.3. Brake Valve Adjustments
- 1.15.4. Tram System
- 1.15.5. Feed/Boom Valve Adjustment
- 1.15.6. Main Pump Adjustments (Vickers PVD45)
- 1.15.7. Main Pump Adjustments (Rexroth A11VLO)
- 1.15.8. Rotation Pump Circuit
- 1.15.9. Drill Feed Valve Adjustments
- 1.15.10. Collaring Circuit Adjustment……………………………………………………………………………………
- 1.15.11. Anti-Jam / Collaring Circuit
- 1.15.12. Reverse Percussion Option
- 1.15.13. Dust Collector Assembly
- 1.15.13.1. Function of Dust Collector
- 1.15.13.2. Initial Start-up and Tuning
- 1.15.13.3. Dust Collector Valve – Adjustment
- 1.15.13.4. Air Pressure Regulator – Adjustment
- 1.15.13.5. Timer – Adjustment
- 1.15.13.6. Filter Elements
- 1.15.13.7. Operational Variables
- 1.15.13.8. Fine Tuning
- 1.15.13.9. Manometer Setup Instructions
- 1.15.13.10. Timer Installation
- 1.15.13.11. Control Circuit
- 1.15.13.12. Fan Removal and Installation
- 1.15.13.13. Troubleshooting Hints
- 1.15.14. Centralizer Adjustment
- 1.15.15. Vertical Indicator
- 1.15.16. Rod Changer Valve
- 1.15.16.1. Pressure Adjustments
- 1.15.17. Bank Valve – Cab/Drill Console
- 1.15.17.1. Pressure Adjustments
- 1.15.18. Coupling Grease System
- 1.15.18.1. Adjustments
- 1.15.18.2. Daily Maintenance
- 1.15.18.3. Air Pressure Regulator
- 1.15.18.4. Filter Assembly
- 1.15.18.5. Lubricator Assembly
- 1.15.18.6. Way Air Valve
- 1.16. Section 8
- 1.17. VENDOR SERVICE INFORMATION
- 1.17.1. Bonfiglioli
- 1.17.2. Char-Lynn / H Series
- 1.17.3. Char-Lynn 2000 Series
- 1.17.4. Fairfield / CT26C
- 1.17.5. Fairfield S1A Final Drive
- 1.17.6. General Engineering
- 1.17.7. Lincoln / 82716 – Series F
- 1.17.8. Rexroth / A2FM90
- 1.17.9. Rexroth / A6VM107
- 1.17.10. Rexroth / A11VLO130
- 1.17.11. Rexroth / A4FM28
- 1.17.12. Star Dynamics
- 1.17.13. Sundstrand/Series 51
- 1.17.14. Texas Hydraulics
- 1.17.15. Vickers / PVE19L
- 1.18. Section 9
- 1.19. Hydraulic Rock Drill Repair
- 1.20. HPR2 Service 408860.pdf
- 1.20.1. Table of Contents
- 1.20.2. Overview of Potential Hazards
- 1.20.3. Safety Instructions
- 1.20.4. Maintenance and Equipment Transfer
- 1.20.5. Start-Up Procedure
- 1.20.6. Operation and After Operation
- 1.20.7. General Maintenance Tips
- 1.20.8. Preventive Maintenance
- 1.20.9. At the beginning of every shift
- 1.20.10. TROUBLESHOOTING
- 1.20.11. General Tips on Drill Overhaul
- 1.20.12. Tool Requirements
- 1.20.13. Special Tool List
- 1.20.14. Drill Torque Specifications
- 1.20.15. Removal of Drill from the Feed
- 1.20.16. Installation of Drill on the Feed
- 1.20.17. Drill Disassembly
- 1.20.18. Drill Assembly
- 1.20.19. Charging the Accumulators
- 1.20.20. Hydraulic Oils for Percussion Drills
- 1.20.21. Hydraulic Drill Rotation Unit Lubrication
- 1.20.22. HPR2 Wear Tolerances (51mm shank)………………………………………………………………………..
- 1.20.23. HPR2 Wear Tolerances (68mm shank)………………………………………………………………………
- 1.20.24. Section 10
- 1.20.25. LUBRICATION TORQUE SPECIFICATIONS
- 1.20.25.1. Hydraulic Oils for Percussion Drills
- 1.20.25.2. Lubrication and Inspection
- 1.20.25.3. Engine Oil
- 1.20.25.4. Preventive Maintenance Chart
- 1.20.25.5. Bolt Maintenance
- 1.20.25.6. Bolt Torque Specifications
- 1.20.25.7. Maintenance Record










