Bucyrus SKS Rotary Blasthole Drill Operation And Maintenance Manual BI615867

$30.00

  • Type Of Manual: Operation And Maintenance Manual
  • Manual ID: BI615867
  • Number of Pages: 292
  • Size: 14.1MB
  • Format: PDF

Product details

  • Model List:

    • SKS Rotary Blasthole Drill
  • 1. PARTS ORDERING AND PRODUCT SUPPORT
  • 2. Contents
  • 3. Safety Information
  • 4. Product Description
  • 5. SKS Models
  • 6. SKS-W Component Locator
  • 7. SKS-13 Component Locator
  • 8. SKS-16 Component Locator
  • 9. SKSS Component Locator
  • 10. Section 1 – Safety
  • 10.1. Hazard Classification
  • 10.2. Overview of Potential Hazards
  • 10.3. Safety Guidelines
  • 10.4. Safety Sign List
  • 10.5. Safety Sign Locator
  • 10.6. Safety Signs
  • 11. Section 2 – Operator Controls
  • 11.1. Graphic Symbol Legend
  • 11.2. Control Console
  • 11.3. Switch Panel
  • 11.4. Light Switches and Circuit Breakers
  • 11.5. Optional Panels
  • 11.6. Cab Controls
  • 11.7. Cat Electronic Monitoring System)
  • 11.8. Cab Heater
  • 11.9. Air Conditioner
  • 11.10. Operator Seat
  • 12. Section 3 – Lubrication and Preventative Maintenance
  • 12.1. Service PointsMainframe
  • 12.1.1. Auto Lube System
  • 12.2. Service Points – General
  • 12.3. Service PointsMast
  • 12.4. LubricationGeneral
  • 12.5. Lubrication and Maintenance Chart
  • 12.6. Lubricant Specifications
  • 12.6.1. Hydraulic System
  • 12.6.2. Compressor
  • 12.6.3. Engine Oil (Caterpillar)
  • 12.6.4. Engine Oil (Cummins)
  • 12.6.5. Water Pump (Cat Pump)
  • 12.6.6. Lubricating Grease
  • 12.6.7. Gear Lubricant
  • 12.7. Cold Weather Lubricants
  • 12.8. Preventive Maintenance
  • 12.8.1. Weld Inspection
  • 12.8.2. Mast Pivot Shaft Inspection and Repair
  • 12.8.3. Hydraulic System
  • 12.8.4. Cooling System – Cummins
  • 12.8.5. Air Cleaners
  • 12.8.6. Electrical System
  • 12.8.7. Extended Machine Shutdown
  • 12.8.8. Scheduled Oil Sampling Analysis
  • 12.9. Drill Stem Thread Lubricator
  • 12.10. Wiggins Rapid Fill
  • 12.11. Bolt Torque Specifications
  • 12.12. Torque Values for Split Flange Connections
  • 12.13. Torque Values for Hydraulic Tubes Fittings
  • 12.14. Maintenance Record
  • 13. Section 4 – Operating Instructions
  • 13.1. Pre-Start Checks
  • 13.2. Fire Suppression System
  • 13.3. Start-Up Procedure
  • 13.4. Shutdown Procedure
  • 13.5. Emergency Shutdown
  • 13.6. Cold Weather Start-Up
  • 13.6.1. Hydraulic System Warm-Up (without cold weather package)
  • 13.6.2. Compressor Warm-Up (Low Pressure)
  • 13.6.3. Compressor Warm-Up (High Pressure)
  • 13.7. Propelling Machine
  • 13.7.1. Propelling Up, Down and Across Grades
  • 13.7.2. Propelling Over Cables
  • 13.8. Leveling Machine
  • 13.9. Raising Mast
  • 13.10. Lowering Mast
  • 13.11. Loading Drill Pipe
  • 13.12. Preparing to Drill
  • 13.13. Drilling Operations
  • 13.13.1. Rotary Drilling
  • 13.13.2. Multiple Pass Drilling
  • 13.13.3. Adding Drill Pipe
  • 13.13.4. Retracting Drill Pipe
  • 14. Section 5 – Drilling Practices
  • 14.1. Drilling Terminology
  • 14.2. Bit Weight Rotary Speeds
  • 14.3. Rotary Drill Bits
  • 14.4. Rotary Blast Hole Drill Strings
  • 14.5. Drill Bit Stabilizers
  • 14.6. Compressed Air
  • 14.7. Drilling Related Problems
  • 14.8. Operating Problems and Indicators
  • 14.9. Solving Drilling Problems
  • 15. Section 6 – Machine Specifications and Transport
  • 15.1. Dimensions
  • 15.2. Shipping Weights and Dimensions
  • 15.3. Machine Transport
  • 15.3.1. Mast Removal and Installation
  • 15.3.2. Loading Machine
  • 15.3.3. Unloading Machine
  • 15.3.4. Loading and Unloading Mast
  • 15.4. SKS Transient Stability Limits
  • 15.5. Cab Line of Sight
  • 15.6. Drilling Accessories
  • 16. Section 10 – Options and Accessories
  • 16.1. Cold Weather Operation
  • 16.2. Heater/Controller (Kim HotStart)
  • 16.3. Vigilante System
  • 16.4. Lube Controller Manual
  • 16.5. Drilling Efficiency Indicator
  • 16.6. Engine Monitor (Murphy PowerView)
  • 16.7. Shock Sub
Rate this product