Bucyrus VT620 Versatrac Operation Manual A6474X271
$30.00
- Type Of Manual: Operation Manual
- Manual ID: A6474X271
- Number of Pages: 176
- Size: 4.6MB
- Format: PDF
Product details
-
Model List:
- VT620 Versatrac
- 1. 1. About this manual
- 2. About this manual ………………………………………………………… 1.3
- 3. Before starting to work………………………………………………… 1.3
- 4. Who is this operating manual intended for? …………………… 1.3
- 5. What is the purpose of this operating manual? ………………. 1.4
- 6. Characters and symbols ……………………………………………… 1.5
- 7. 2. Your safety
- 8. Your safety …………………………………………………………………… 2.3
- 9. Personnel………………………………………………………………….. 2.4
- 10. Operation ……………………………………………………………… 2.4
- 11. Installation and repair……………………………………………… 2.4
- 12. Operating conditions…………………………………………………… 2.5
- 13. Intended use …………………………………………………………. 2.5
- 14. Unauthorized use…………………………………………………… 2.5
- 15. Safety instructions………………………………………………………. 2.7
- 16. General rules: ……………………………………………………….. 2.7
- 17. Storage and transport …………………………………………….. 2.8
- 18. Pre-start inspection………………………………………………… 2.8
- 19. Installation and start-up…………………………………………… 2.9
- 20. Operation ……………………………………………………………… 2.9
- 21. Stopping……………………………………………………………….2.10
- 22. Maintenance and repair ………………………………………….2.10
- 23. Overview of the safety instructions……………………………….2.15
- 24. Chapter 3: Storage and transport …………………………….2.15
- 25. Chapter 4: Installation…………………………………………….2.15
- 26. Chapter 5: Operation ……………………………………………..2.16
- 27. Chapter 6: Technical data……………………………………….2.23
- 28. 3. Storage and transport
- 29. Storage and transport …………………………………………………… 3.3
- 30. Storage …………………………………………………………………….. 3.3
- 31. Storage of the machine and spare parts……………………. 3.3
- 32. Transport…………………………………………………………………… 3.4
- 33. Before transport …………………………………………………….. 3.5
- 34. 4. Installation
- 35. Installation……………………………………………………………………. 4.3
- 36. Points to observe prior to installation…………………………….. 4.3
- 37. Who is allowed to carry out installation?……………………. 4.3
- 38. Which tools are required for installation?…………………… 4.3
- 39. Notes on installation……………………………………………….. 4.4
- 40. Pre-installation check list ………………………………………… 4.5
- 41. Safety features………………………………………………………. 4.6
- 42. 5. Operation
- 43. Operation ……………………………………………………………………… 5.3
- 44. How to operate the VERSATRAC ®………………………………. 5.3
- 45. Who is allowed to operate the VERSATRAC ®…………… 5.3
- 46. When can operation be started?………………………………. 5.3
- 47. Controls and indicators ……………………………………………….. 5.4
- 48. Operator’s compartment …………………………………………. 5.4
- 49. Control handle……………………………………………………….. 5.8
- 50. Hazard zone………………………………………………………………5.16
- 51. Starting procedure………………………………………………………5.17
- 52. General…………………………………………………………………5.17
- 53. Machine operation………………………………………………….5.18
- 54. Shutdown procedure…………………………………………………..5.21
- 55. Procedures for loading and unloading
- 56. The Longwall roof support …………………………………………..5.23
- 57. Loading from the long axis of the shield ……………………5.23
- 58. Unloading from the long axis of the shield…………………5.23
- 59. Loading from the side of the shield …………………………..5.24
- 60. Unloading from the side of the shield………………………..5.25
- 61. Towing a disabled machine …………………………………………5.26
- 62. Battery change procedure……………………………………………5.27
- 63. Instructions on the maintenance…………………………………..5.33
- 64. Important notes ……………………………………………………..5.33
- 65. Before maintenance……………………………………………….5.33
- 66. Critical torque values………………………………………………5.35
- 67. Lubricants, fluids and capacities ………………………………5.35
- 68. Specific lubrication and maintenance instructions …………..5.39
- 69. Every third shift ……………………………………………………..5.39
- 70. Weekly………………………………………………………………….5.45
- 71. Monthly…………………………………………………………………5.51
- 72. Every three months ………………………………………………..5.52
- 73. Replacement of wear parts ………………………………………….5.57
- 74. Tire/wheel installation……………………………………………..5.57
- 75. Wheel mounting procedure……………………………………..5.59
- 76. Drive motor/gearbox removal/installation…………………..5.61
- 77. Axle removal/installation …………………………………………5.65
- 78. Drive shaft removal/installation ………………………………..5.68
- 79. Pump and motor removal/installation………………………..5.70
- 80. Accumulator operation and precharging……………………5.72
- 81. Bucket installation/removal ……………………………………..5.74
- 82. Ejector blade and cylinder removal/installation…………..5.76
- 83. Canopy/cab removal ………………………………………………5.78
- 84. Steering cylinder removal/installation ……………………….5.79
- 85. Tilt cylinder removal/installation ……………………………….5.81
- 86. Lift cylinder removal/installation ……………………………….5.83
- 87. Battery lift cylinder removal/installation……………………..5.85
- 88. Lift plate installation/removal……………………………………5.87
- 89. Brake bleeding procedure……………………………………….5.88
- 90. Adjustment procedures ……………………………………………….5.89
- 91. Main relief – primary (main implement) pump section….5.89
- 92. Unloading valve……………………………………………………..5.90
- 93. Relief valve – brake cooling manifold ………………………..5.92
- 94. Troubleshooting procedures………………………………………..5.93
- 95. Hydraulic system (general) ……………………………………..5.94
- 96. Brakes………………………………………………………………….5.97
- 97. Hydraulic cylinders…………………………………………………5.99
- 98. Hydraulic pump …………………………………………………… 5.100
- 99. Valves ……………………………………………………………….. 5.102
- 100. 6. Technical data
- 101. Technical data………………………………………………………………. 6.3
- 102. Tightening torques ……………………………………………………… 6.5
- 103. Permissible data ………………………………………………………..6.11
- 104. Lubrication fluids and greases …………………………………6.11
- 105. 7. For your information
- 106. For your information …………………………………………………….. 7.3
- 107. Our service………………………………………………………………… 7.3
- 108. Service address …………………………………………………….. 7.3
- 109. Rebuild facility address…………………………………………… 7.4










