Bucyrus VT680 Versatrac Operation Manual A6474X314

$30.00

  • Type Of Manual: Operation Manual
  • Manual ID: A6474X314
  • Number of Pages: 144
  • Size: 12.8MB
  • Format: PDF

Product details

  • Model List:

    • VT680 Versatrac
  • 1. 1. About this manual
  • 2. About this manual…………………………………………………………. 1.3
  • 3. Before starting to work ………………………………………………… 1.3
  • 4. Who is this operating manual intended for?……………………. 1.3
  • 5. What is the purpose of this operating manual?……………….. 1.4
  • 6. Characters and symbols ……………………………………………… 1.5
  • 7. 2. Your safety
  • 8. Your safety……………………………………………………………………. 2.3
  • 9. Personnel ………………………………………………………………….. 2.4
  • 10. Operation………………………………………………………………. 2.4
  • 11. Installation and repair……………………………………………… 2.4
  • 12. Operating conditions …………………………………………………… 2.5
  • 13. Intended use………………………………………………………….. 2.5
  • 14. Unauthorized use …………………………………………………… 2.5
  • 15. Safety instructions………………………………………………………. 2.7
  • 16. General rules:………………………………………………………… 2.7
  • 17. Storage and transport……………………………………………… 2.8
  • 18. Pre-start inspection ………………………………………………… 2.8
  • 19. Installation and start-up…………………………………………… 2.9
  • 20. Operation………………………………………………………………. 2.9
  • 21. Stopping ……………………………………………………………… 2.10
  • 22. Maintenance and repair…………………………………………. 2.10
  • 23. Overview of the safety instructions ……………………………… 2.15
  • 24. Chapter 3: Storage and transport……………………………. 2.15
  • 25. Chapter 4: Installation …………………………………………… 2.15
  • 26. Chapter 5: Operation…………………………………………….. 2.16
  • 27. Chapter 6: Technical data ……………………………………… 2.21
  • 28. 3. Storage and transport
  • 29. Storage and transport……………………………………………………. 3.3
  • 30. Storage……………………………………………………………………… 3.3
  • 31. Storage of the machine and spare parts ……………………. 3.3
  • 32. Transport…………………………………………………………………… 3.4
  • 33. Before transport……………………………………………………… 3.5
  • 34. 4. Installation
  • 35. Installation ……………………………………………………………………. 4.3
  • 36. Points to observe prior to installation …………………………….. 4.3
  • 37. Who is allowed to carry out installation? ……………………. 4.3
  • 38. Which tools are required for installation? …………………… 4.3
  • 39. Notes on installation……………………………………………….. 4.4
  • 40. Pre-installation check list…………………………………………. 4.5
  • 41. Safety features ………………………………………………………. 4.6
  • 42. 5. Operation
  • 43. Operation ……………………………………………………………………… 5.3
  • 44. How to operate the VERSATRAC ® ………………………………. 5.3
  • 45. Who is allowed to operate the VERSATRAC ® …………… 5.3
  • 46. When can operation be started? ………………………………. 5.3
  • 47. Controls and indicators………………………………………………… 5.4
  • 48. Operator’s compartment………………………………………….. 5.4
  • 49. Hazard zone …………………………………………………………….. 5.18
  • 50. Starting procedure…………………………………………………….. 5.19
  • 51. Machine operation…………………………………………………….. 5.20
  • 52. Shutdown procedure …………………………………………………. 5.24
  • 53. Procedures for loading and unloading a shield……………… 5.25
  • 54. Loading from the long axis of the shield…………………… 5.25
  • 55. Unloading from the long axis of the shield ……………….. 5.26
  • 56. Loading from the side of the shield …………………………. 5.26
  • 57. Unloading from the side of the shield………………………. 5.27
  • 58. Towing a disabled machine………………………………………… 5.28
  • 59. Battery change procedure………………………………………….. 5.29
  • 60. Instructions on the maintenance …………………………………. 5.33
  • 61. Important notes ……………………………………………………. 5.33
  • 62. Before maintenance ……………………………………………… 5.33
  • 63. Critical torque values…………………………………………….. 5.35
  • 64. Lubricants, fluids and capacities …………………………….. 5.35
  • 65. Fire suppression linear detection wire………………………….. 5.39
  • 66. Specific lubrication and maintenance instructions …………. 5.40
  • 67. Every third shift…………………………………………………….. 5.40
  • 68. Weekly………………………………………………………………… 5.47
  • 69. Monthly……………………………………………………………….. 5.55
  • 70. Every three months ………………………………………………. 5.56
  • 71. Instructions on the adjustment procedures …………………… 5.61
  • 72. Main relief – pressure compensated variable pump …… 5.61
  • 73. Pressure regulation, accumulator system ………………… 5.62
  • 74. Relief valve – brake cooling manifold ………………………. 5.63
  • 75. Pressure reducing valve – HRC pilot control circuit……. 5.64
  • 76. Differential lock pressure adjustment ………………………. 5.65
  • 77. Bi-directional relief – front end ………………………………… 5.66
  • 78. Bi-directional relief – rear end …………………………………. 5.67
  • 79. Jet fill pump flow control valve………………………………… 5.68
  • 80. Troubleshooting procedures ………………………………………. 5.69
  • 81. Hydraulic system (general)…………………………………….. 5.70
  • 82. Brakes ………………………………………………………………… 5.73
  • 83. Hydraulic cylinders ……………………………………………….. 5.76
  • 84. Hydraulic pump ……………………………………………………. 5.76
  • 85. Valves…………………………………………………………………. 5.78
  • 86. 6. Technical data
  • 87. Technical data ………………………………………………………………. 6.3
  • 88. Tightening torques………………………………………………………. 6.9
  • 89. Permissible data……………………………………………………….. 6.15
  • 90. Lubrication fluids and greases………………………………… 6.15
  • 91. 7. For your information
  • 92. For your information……………………………………………………… 7.3
  • 93. Our service………………………………………………………………… 7.3
  • 94. Service address……………………………………………………… 7.3
  • 95. Rebuild facility address …………………………………………… 7.4
Rate this product