Caterpillar CM220 Continuous Miner Operation And Maintenance Manual A6474X307
$30.00
- Type Of Manual: Operation And Maintenance Manual
- Manual ID: A6474X307
- Number of Pages: 356
- Size: 20.6MB
- Format: PDF
Product details
-
Model List:
- CM220 Continuous Miner
- 1. 1. About this manual
- 2. About this manual…………………………………………………………. 1.3
- 3. Before starting to work ………………………………………………… 1.3
- 4. Who is this operating manual intended for?……………………. 1.3
- 5. What is the purpose of this operating manual?……………….. 1.4
- 6. Characters and symbols ……………………………………………… 1.5
- 7. 2. Your safety
- 8. Your safety……………………………………………………………………. 2.3
- 9. Personnel ………………………………………………………………….. 2.4
- 10. Operation………………………………………………………………. 2.4
- 11. Installation and repair……………………………………………… 2.4
- 12. Operating conditions …………………………………………………… 2.5
- 13. Intended use………………………………………………………….. 2.5
- 14. Unauthorized use …………………………………………………… 2.5
- 15. Safety instructions………………………………………………………. 2.6
- 16. General rules:………………………………………………………… 2.6
- 17. Storage and transport……………………………………………… 2.7
- 18. Pre-start inspection ………………………………………………… 2.7
- 19. Installation and start-up…………………………………………… 2.8
- 20. Operation………………………………………………………………. 2.8
- 21. Stopping ……………………………………………………………… 2.9
- 22. Maintenance and repair…………………………………………. 2.10
- 23. 3. Storage and transport
- 24. Storage and transport……………………………………………………. 3.3
- 25. Storage……………………………………………………………………… 3.3
- 26. Storage of the machine and spare parts……………………. 3.3
- 27. Long-term storage of spare components …………………… 3.4
- 28. Transport…………………………………………………………………… 3.5
- 29. Load units: dimensions and weights …………………………. 3.5
- 30. Transport environment ……………………………………………. 3.6
- 31. 4. Installation
- 32. Installation ……………………………………………………………………. 4.3
- 33. Points to observe prior to installation …………………………….. 4.3
- 34. Who is allowed to carry out installation? ……………………. 4.3
- 35. Which tools are required for installation?…………………… 4.3
- 36. Notes on installation……………………………………………….. 4.4
- 37. Pre-installation check list…………………………………………. 4.5
- 38. Safety features ………………………………………………………. 4.6
- 39. 5. Operation
- 40. Operation ……………………………………………………………………… 5.3
- 41. How to operate the Continuous Miner……………………………. 5.3
- 42. Who is allowed to operate the Continuous Miner………… 5.3
- 43. When can operation be started? ………………………………. 5.3
- 44. Controls and indicators………………………………………………… 5.4
- 45. Machine control system……………………………………………….. 5.17
- 46. Red zone …………………………………………………………………. 5.26
- 47. Safety precautions for underground operation………………. 5.31
- 48. Tramming safety rules……………………………………………….. 5.31
- 49. Starting procedure…………………………………………………….. 5.32
- 50. Shutdown procedure …………………………………………………. 5.34
- 51. Tramming the miner ………………………………………………….. 5.35
- 52. Cutter head operation………………………………………………… 5.37
- 53. Conveyor operation…………………………………………………… 5.39
- 54. Scrubber motor operation ………………………………………….. 5.39
- 55. Area and headlight operation ……………………………………… 5.39
- 56. Fire suppression in radio remote operation ………………….. 5.40
- 57. Conveyor raise/lower/left/right in radio remote operation .. 5.40
- 58. Stabilizer cylinder raise/lower in radio remote operation … 5.41
- 59. Shear up/down in radio remote operation…………………….. 5.41
- 60. Gathering head raise/float in radio remote operation……… 5.41
- 61. Breaker on/off in radio remote operation ……………………… 5.42
- 62. Mechanical assemblies ……………………………………………… 5.43
- 63. Hydraulic system ………………………………………………………. 5.49
- 64. Water system …………………………………………………………… 5.81
- 65. Electrical system ………………………………………………………. 5.91
- 66. Instructions on the maintenance …………………………………5.125
- 67. Important notes ……………………………………………………5.125
- 68. Before maintenance ……………………………………………..5.125
- 69. Torque values………………………………………………………5.126
- 70. Lubricants, fluids and capacities …………………………….5.127
- 71. Specific lubrication and maintenance instructions …………5.128
- 72. Every shift……………………………………………………………5.131
- 73. Every third shift (daily)…………………………………………..5.133
- 74. Weekly………………………………………………………………..5.138
- 75. Monthly……………………………………………………………….5.141
- 76. Every three months ………………………………………………5.148
- 77. Every six months ………………………………………………….5.151
- 78. Adjustment procedures ……………………………………………..5.153
- 79. Setting hydraulic pressures…………………………………….5.153
- 80. Load holding valve ……………………………………………….5.154
- 81. Pilot pump circuit relief ………………………………………….5.155
- 82. Main control valve ………………………………………………..5.156
- 83. Port relief …………………………………………………………….5.158
- 84. Tram track …………………………………………………………..5.160
- 85. Tail shim ……………………………………………………………..5.165
- 86. Chain tension ………………………………………………………5.167
- 87. Hydraulic ……………………………………………………..5.167
- 88. Instructions on replacement of wear parts ……………………5.168
- 89. Cutter head (boom) assembly………………………………..5.168
- 90. Boom pivot pin……………………………………………………..5.172
- 91. Shear cylinder ……………………………………………………..5.177
- 92. Center cutter drum ……………………………………………….5.182
- 93. End cutter drum……………………………………………………5.186
- 94. Drum drive motor………………………………………………….5.188
- 95. Drum drive gear case……………………………………………5.193
- 96. Gathering head assembly ……………………………………..5.195
- 97. Gathering head drive motor …………………………………..5.201
- 98. Gathering head gear case……………………………………..5.206
- 99. Gathering head foot shaft………………………………………5.212
- 100. Gathering head lift cylinder…………………………………….5.215
- 101. CLA…………………………………………………………………….5.218
- 102. CLA tip replacement……………………………………………..5.221
- 103. Tram motor………………………………………………………….5.222
- 104. Tram primary planetary gear………………………………….5.227
- 105. Tram secondary planetary gear ……………………………..5.230
- 106. Tram case …………………………………………………………..5.235
- 107. Tram reach gear set ……………………………………………..5.240
- 108. Tram sprocket ……………………………………………………..5.248
- 109. Tram track front idler …………………………………………….5.255
- 110. Front idler take-up cylinder…………………………………….5.259
- 111. Hydraulic pump ……………………………………………………5.261
- 112. Hydraulic pump motor …………………………………………..5.264
- 113. Scrubber fan/motor……………………………………………….5.267
- 114. Stabilizer cylinder …………………………………………………5.270
- 115. Swivel pin assembly……………………………………………..5.273
- 116. Tail roller……………………………………………………………..5.275
- 117. Conveyor chain replacement …………………………………5.277
- 118. Troubleshooting procedures…………………………………..5.278
- 119. Typical hydraulic problems…………………………………….5.279
- 120. Contaminants in hydraulic systems…………………………5.280
- 121. Specific hydraulic circuits ………………………………………5.281
- 122. Multi-function failure ………………………………………5.281
- 123. Oil tank fill…………………………………………………….5.282
- 124. Cutter head raise…………………………………………..5.282
- 125. Cutter head lower………………………………………….5.282
- 126. Gathering head raise……………………………………..5.283
- 127. Gathering head float………………………………………5.283
- 128. Conveyor raise ……………………………………………..5.283
- 129. Conveyor lower …………………………………………….5.284
- 130. Conveyor swing…………………………………………….5.284
- 131. Stabilizer raise………………………………………………5.284
- 132. Stabilizer lower……………………………………………..5.284
- 133. General safety procedure for shutdown …………………. 5.285
- 134. Excessive noise ………………………………………………….. 5.286
- 135. Excessive heat……………………………………………………. 5.287
- 136. Incorrect flow ……………………………………………………… 5.288
- 137. Incorrect pressure……………………………………………….. 5.289
- 138. Faulty operation ………………………………………………….. 5.290
- 139. Restarting checklist……………………………………………… 5.291
- 140. Water system……………………………………………………… 5.292
- 141. Bearings…………………………………………………………….. 5.294
- 142. Electrical system…………………………………………………. 5.295
- 143. 6. Technical data
- 144. Technical data………………………………………………………………..6.3
- 145. Tightening torques……………………………………………………….6.5
- 146. Permissible media ……………………………………………………….6.7
- 147. Lubrication fluids and greases…………………………………..6.7
- 148. 7. For your information
- 149. For your information ………………………………………………………7.3
- 150. Our service …………………………………………………………………7.3
- 151. Service address ………………………………………………………7.3










